Notes For The Set Up - Horizon Fitness H-500 User Manual

Fuel cell stack
Hide thumbs Also See for H-500:
Table of Contents

Advertisement

6. Notes for the set-up
Note: The pictures below are only for reference.
Stack should be placed like this
position. Stand on the plastic feet.
Manual_FCS-C500_V1.1_EN
The tube between stack output and purging valve is required
to be less than 20cm. The tube connected to the purging valve
output is required to be less than 30cm. The inner diameter of the
tube is required to be more than 2mm.
Warning: The tube between the hydrogen pressure regulator
and the fuel cell gas input must be less than 30cm.
The pressure of the hydrogen is
between 0.45--0.55Bar.
The voltage of external power supply is
between 12V-14V, the current range is
different based on the different stack.
The load connecter, load+, is connected to
the "load +"in the controller. The load- is
connected to "FC- & Load-" in the stack.
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcs-c500

Table of Contents