Clenergy PV-ezRack SolarRoof DC Instruction Manual

Clenergy PV-ezRack SolarRoof DC Instruction Manual

Mounting system

Advertisement

Quick Links

Mounting system instruction manual
1. Document Summary
Rev
Date
1.0
May.12.2022
1.1
August.28.2022
1.2
Oct.12.2022
Offices:
Channels:
L: @Clenergy
|
Description
First Generation
Delete the vertical spacing of the Roof Hooks and chapter 5
Change the name of the roof hook
China
|
Australia
|
Japan
FB: @Clenergyglobal
|
T: @Clenergy_global
999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone
Xiang'an District 361101, Xiamen, Fujian, China
E:
sales@clenergy.com.cn
Tel: +86 592 311 0088 | SHA:603628
|
Germany
|
Thailand
|
Philipines
|
YT: @Clenergy
| W:
www.clenergy.com.cn
Created by Clenergy
Written by
Mao
Mao
Wright
|
Singapore
|
I: @ClenergyClub

Advertisement

loading
Need help?

Need help?

Do you have a question about the PV-ezRack SolarRoof DC and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Clenergy PV-ezRack SolarRoof DC

  • Page 1 999-1009 Min'an Rd, Huoju Hi-tech Ind. Dev. Zone Xiang'an District 361101, Xiamen, Fujian, China sales@clenergy.com.cn | W: www.clenergy.com.cn Tel: +86 592 311 0088 | SHA:603628 Created by Clenergy Mounting system instruction manual 1. Document Summary Date Description Written by May.12.2022 First Generation August.28.2022...
  • Page 2 Adjustable Tile Interface, with carbon steel main body) Code-Compliant Planning and Installation Guide Complying with Eurocodes 0-9 and VDI 6012 2 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 3 Safety regulations. Please also pay attention to any other relevant State or Federal regulations. Please check that you are using the latest version of the Installation Manual, which you can do by contacting Clenergy via email on sales@clenergy.com.com. 1 / 12 Offices:...
  • Page 4 • VDI 6012 Blatt 1.4 Integration of decentralised and regenerative energy systems in buildings •EN 1995-1-1: Eurocode 5: Design of timber structures 2 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 5 EZ-CC-DC ER-CC-DC50/2 ER-RC-DC50/G/2 Grounding Rail Cross Connector for Cable Clip Clamp for DC Rail DC Rail 50, version 3 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 6 Tel: +86 592 311 0088 | SHA:603628 3. System Overview 3.1 Overview of PV-ezRack SolarRoof DC - Single layer (mounting rails), mounting solar panels in portrait 1) End Clamp 2) Inter Clamp 3) DC Rail 50 4) Tile interface 5) Splice for DC Rail 50...
  • Page 7 Always check the installation manual of the PV-Module you use in order to determine the allowed fixing points on the module frame. 5 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 8 The wood connections are to be made according to EN 1995-1- 1:2004+A1:2008 6 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 9 Caution! Do not use fitted roof hooks as a ladder, as this extreme point load could damage the tile below. 7 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 10 DC rail 50 at any given point, move the grounding clamp 2.0 towards to the opening 8 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 11 Rails are perpendicular to the rafter Double layer (cross rail) 9 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 12 PV Modules are completely pressed against the Inter Clamp and Grounding Clip. Visually check that Grounding Clips are positioned properly. 10 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 13 Click the cable clip into the rail. Insert the cables into the holes of cable clips as shown on the right figures. 11 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...
  • Page 14 Insert the copper wire into the grounding lug and fasten the M8 Torx screw tightly with 8N.m. as shown on the right figures. 12 / 12 Offices: China Australia Japan Germany Thailand Philipines Singapore Channels: L: @Clenergy FB: @Clenergyglobal T: @Clenergy_global YT: @Clenergy I: @ClenergyClub...