Connect Air Lines
Kit includes 30 ft (9.15 m) of tubing (4). Cut to
necessary lengths. If your installation requires
more tubing than supplied, ensure that it is sol-
vent compatible.Tubing inside box is already con-
nected.
1.
Cut one length of tubing (4) to connect control box
air input to main air line. See F
2.
Cut four lengths of tubing (4) to connect control box
ON and OFF ports to dispense valve (2) ON and
OFF ports. See F
IG
2
COMPONENT A
ON
COMPONENT A
OFF
F
. 3. Connect Air Lines
IG
4
. 3.
IG
. 3.
A SIDE
COMPONENT B
ON
COMPONENT B
OFF
4
Connect Solvent Pump
WARNING
Use only solvent flush hoses rated to withstand the
maximum working pressure of the solvent pump.
1.
See F
. 2. Install one end of tee (E) in fluid inlet of
IG
component A dispense valve (F). Connect a short
solvent hose (G) between tee and fluid inlet of com-
ponent B dispense valve (H).
2.
Connect a solvent supply line (J) between solvent
pump outlet and branch of tee.
B SIDE
AIR
ON
INPUT
ON
OFF
OFF
4
TI5506a
COMPONENT A
COMPONENT B
SIDE
SIDE
ON
OFF
OFF
OFF
ON
AIR
INPUT
ON
Detail of Tubing Inside Control Box
Installation
ON
OFF
TI5505a
310800C