Riello 3808511 Installation, Use And Maintenance Instructions page 23

Heavy oil burner
Table of Contents

Advertisement

Available languages

Available languages

INDEX
1.
BURNER DESCRIPTION . . . . . . . . . . . . . . 1
1.1 Burner equipment . . . . . . . . . . . . . . . . . . . 1
2.
TECHNICAL DATA . . . . . . . . . . . . . . . . . . 2
2.1 Technical data . . . . . . . . . . . . . . . . . . . . . . 2
2.2 Overall dimensions . . . . . . . . . . . . . . . . . . 3
2.3 Working field . . . . . . . . . . . . . . . . . . . . . . . 3
3.
INSTALLATION . . . . . . . . . . . . . . . . . . . . . 4
3.1 Heavy oil supply line . . . . . . . . . . . . . . . . . . 4
3.2 Electrical system . . . . . . . . . . . . . . . . . . . . 5
3.3 Electrical connections . . . . . . . . . . . . . . . . 8
1.
BURNER DESCRIPTION
One, two, third stage heavy oil burner.
The burner meets protection level of IP 40, EN 60529.
Burner with CE marking in conformity with EEC directives: EMC 89/336/EEC, Low Voltage 73/23/EEC
and Machines 98/37/EEC.
Fig. 1
1 - Suction line
2 - Return line
3 - Air shutter opening motor
4 - Pump pressure adjustment screw
5 - Manometer plug (G1/4)
6 - Vacuometer plug (G1/4)
7 - Reset push-button of the motor overload relay
8 - Electric board
9 - Cable clamps
10 - Control box reset push-button and lock-out lamp
11 - Adjustment thermostat
1.1
BURNER EQUIPMENT
Flexible tubes . . . . . . . . . . . . . . . . . . . . . . No. 2
Cable clamps . . . . . . . . . . . . . . . . . . . . . . No. 5
Gasket for flange. . . . . . . . . . . . . . . . . . . . No. 1
Extensions (only long head). . . . . . . . . . . . No. 2
2543871
4.
WORKING . . . . . . . . . . . . . . . . . . . . . . . 10
4.1 Choice of nozzles . . . . . . . . . . . . . . . . . . 10
4.2 Pump pressure . . . . . . . . . . . . . . . . . . . . 10
4.3
Combustion head setting . . . . . . . . . . . . . . .11
4.4
Air shutters adjustments . . . . . . . . . . . . . . . .11
4.5
Spray temperature adjustment . . . . . . . . . . 12
4.6
Burner start-up cycle . . . . . . . . . . . . . . . . . 13
4.7
Three stage operation . . . . . . . . . . . . . . . . 13
4.8
Burner start-up cycle diagnostics . . . . . . . . 14
4.9
Operating fault diagnostics . . . . . . . . . . . . . 14
12 - Regulating bush for combustion head
13 - Wiring terminal board
14 - Ignition transformer
15 - Filter
16 - Valves group
17 - Manometer
18 - Lamp
19 - Commutator
20 - Low limit thermostat
21 - High limit thermostat
22 - Timer
Nipples . . . . . . . . . . . . . . . . . . . . . . . . . No. 2
Screws . . . . . . . . . . . . . . . . . . . . . . . . . No. 4
Nozzles . . . . . . . . . . . . . . . . . . . . . . . . No. 3
1
GB

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Press 300 t/n380853308511 d08533 d

Table of Contents