Sharp HN-VA100U Operation Manual page 11

Powerline ethernet adapter
Table of Contents

Advertisement

3
Hold down the SET button on the additional adapter for about 2 seconds
and then release it (this must be done within 2 minutes of completing Step
2).
• When you release the SET button, the POWER indicator will blink and
registration will begin. During registration, communication on the network
may stop temporarily. Registration may take up to 30 seconds.
• Important: Do not remove either adapter from the outlet while registration
is taking place.
4
When registration is completed, the POWER indicator on both adapters
will stop blinking and the PLC indicator on both adapters will light solidly or
blink. Remove the additional adapter from the outlet and install it in the
desired location as explained on page 10.
• If the PLC indicator on the additional adapter does not light up and instead
the POWER indicator blinks in the pattern
2 blinks OFF 2 blinks OFF ...
registration was not successful. Cancel the registration of the adapter as
explained on page 18, and then try registration again.
SET
Registering the Adapter
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hn-va400u

Table of Contents