Download Print this page
Mercia Garden Products 0644AXNE0503HGDD2MW-V1 General Instructions Manual

Mercia Garden Products 0644AXNE0503HGDD2MW-V1 General Instructions Manual

44mm log cabin, apex no extras, 5m x 3m, half glazed double doors, two medium windows

Advertisement

Quick Links

General Instructions
0644AXNE0503HGDD2MW-V1
44MM LOG CABIN, APEX NO EXTRAS, 5M X 3M, HALF GLAZED DOUBLE DOORS, TWO MEDIUM WINDOWS.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
Screws & Nails
Measure
overall
length
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
Bolts
To identify the
xings required
Measure
for each step use a
under the
measuring tape.
head
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0644AXNE0503HGDD2MW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0644AXNE0503HGDD2MW-V1

  • Page 1 EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product. For assistance please contact customer care on: 01636 821215 Refer to the instructions pages for your speci c product code Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2: Window Contents

    0644AXNE0503HGDD2MW-V1 Please retain product label and instructions for future reference Overall Dimensions: Double Door Contents Width = 5148mm Depth = 4134mm Height = 2869mm Base Dimensions: Width = 4818mm Depth = 2814mm Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Bearer - 44x58x2814mm QTY 4 F4458-2814-PT Bearer - 44x58x2293mm QTY 20 Gable QTY 2 F4458-2293-PT AI-0644AXNE0503HGDD2MW-G-V1 Purlin - 45x120x3396mm QTY 5 F45120-AE-3396 Starter Board - 44x66x5000mm QTY 2 LB44RT66-A-5000 Eaves Frame - 27x44x1698mm QTY 4 F2744-1698 Log Board - 44x120x2996mm QTY 38 LB44-A-2996...
  • Page 4: Pre-Assembly

    Please retain product label and instructions for future reference Pre-assembly Step 2 IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 34 QTY 8 *Please note: Following same method, arrange the remaining bearers Each board interlocks at either end in a staggered pattern. (No.
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 5 Step 4 Parts needed - No. 24 QTY 8 Parts Needed - No. 23 QTY 2 No. 25 QTY 8 No.
  • Page 6 Please retain product label and instructions for future reference Step 6 Step 7 IMPORTANT : Pre-drill before xing screws. IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 11 QTY 1 Parts Needed - No. 9 QTY 1 No. 12 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 10 Step 8 Parts needed - No. 24 QTY 14 To adjust and align your doors: No. 26 QTY 14 No. 27 QTY 14 1. Lift up the doors to separate the two parts of the No.
  • Page 8 Please retain product label and instructions for future reference Step 11 IMPORTANT : Pre-drill before xing screws. Step 12 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 2 QTY 2 Parts Needed - No. 1 QTY 2 No. 3 QTY 2 No.
  • Page 9 Please retain product label and instructions for future reference Step 14 Step 16 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 24 QTY 14 Parts needed - No. 22 QTY 2 No. 26 QTY 14 No. 27 QTY 14 Place the gable tops (No.
  • Page 10 Please retain product label and instructions for future reference Step 17 IMPORTANT : Pre-drill before xing screws. Step 18 IMPORTANT : Pre-drill before xing screws. Parts needed - No. 35 QTY 5 Parts needed - No. 31 QTY 64 Align the Roof Purlin(s) (No. 35) Place the rst two roof board’s into the cut out slots on each gable top (No.
  • Page 11 Please retain product label and instructions for future reference Step 19 IMPORTANT: Pre-drill before xing screws. Step 20 Parts needed - No. 36 QTY 4 Lift each window onto the already existing Ensuring the roof boards are ush hooks on the window frame, ensuring the at the overhanging side and meet hook and bands connect.
  • Page 12 Please retain product label and instructions for future reference Step 22 Step 23 IMPORTANT : Pre-drill before xing screws. Parts Needed - No. 18 QTY 1 Lift each door onto the already existing No. 19 QTY 1 hooks on the door frame, ensuring the hook The Mortice Lock is Reversible No.
  • Page 13 Please retain product label and instructions for future reference Step 25 Step 24 IMPORTANT : Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts neeeded - No. 32 QTY 44 Parts Needed - No. 15 QTY 1 No. 21 QTY 2 Place the rst oor board (No.
  • Page 14 Please retain product label and instructions for future reference Step 26 Step 28 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 40 QTY 8 Parts needed - No. 41 Inside the building place the closure Cut the felt into six strips and lay Roof Roof trim (No.
  • Page 15 Please retain product label and instructions for future reference Step 29 Step 30 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 37 QTY 4 Parts needed - No. 39 QTY 8 No. 38 QTY 4 Arrange the storm braces (No.
  • Page 16 Please retain product label and instructions for future reference Step 31 IMPORTANT : Pre-drill before xing screws. Parts Needed: No. 6 QTY 2 No. 16 QTY 1 Attach the Rain Guards (No. 6) to the window frame, xing in place onto the It is ESSENTIAL that you apply wood framing above each window using treatment immediately after the building...