Download Print this page

Advertisement

Quick Links

General Instructions
0644LOG178-V4 (5.8x4.2m)
0644LOG178-V4: 5.8x4.2m 44mm garage cabin
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0644LOG178-V4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0644LOG178-V4

  • Page 1 Winter = High Moisture = Expansion 0644LOG178-V4 (5.8x4.2m) Summer = Low Moisture = Contraction erected by two adults 0644LOG178-V4: 5.8x4.2m 44mm garage cabin BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 0644LOG178-V4 Please retain product label and instructions for future reference Overall Dimensions: Width = 4200mm Log Board - 44x120x5800mm Depth = 5800mm LB44-AD-5800 (Mid Notch - Cut out for door and window) Height = 2710mm Base Dimensions: Purlin - 45x120x5808mm QTY 5...
  • Page 3 Please retain product label and instructions for future reference Finisher Board - 44x45x1978 QTY 4 LB44RG45-B-1978 Finisher Board - 44x45x1771 QTY 2 LB44RG45-C-1771 Pre-assembly *Please note: Hook & Band Hinge QTY 6 Felt Pad Bolt Pull Handle See straight gate H&B kit QTY 2 QTY 2 Each board interlocks at...
  • Page 4 Please retain product label and instructions for future reference Step 1 Step 3 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Parts needed - No. 18 QTY 2 Parts needed - No. 5 QTY 2 No. 19 No. 10 QTY 2 QTY 2 No.
  • Page 5 Please retain product label and instructions for future reference Step 4 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 5: Garage Door Parts needed - No. 6 QTY 6 Parts needed - No. 28 QTY 1 No. 7 QTY 6 No.
  • Page 6 Please retain product label and instructions for future reference Step 7 (See Pre-Assembly) Step 9 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 7 QTY 12 No. 8 QTY 6 Once you have laid the second No. 9 QTY 6 level of boards onto the assembly No.
  • Page 7 Please retain product label and instructions for future reference Step 11 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 13 Parts needed - No. 9 QTY 1 Parts needed - No. 25 QTY 2 No. 12 QTY 1 Place Truss A x2 (No. 25) onto the Following the same method assembly as shown and adjust outlined in Pre-Assembly, lay...
  • Page 8 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 15 Parts needed - No. 13 QTY 5 Align the roof purlin(s) (No. 13) into the cut out slots on each gable top ensuring each ridge bar interlocks the boards.
  • Page 9 Please retain product label and instructions for future reference Step 17 Step 16 Parts needed - No. 27 QTY 4 Parts needed - No. 26 QTY 4 Fix Truss C (No. 27) to Truss A Place the 4x Truss Bs (No. 26) screwing down at an angle with onto the building.
  • Page 10 Please retain product label and instructions for future reference Step 18 IMPORTANT: Pre-drill before xing screws. Step 19 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 17 QTY 106 Parts needed - No. 16 QTY 4 Place the rst two roof board’s Ensuring the roof boards are ush (No.
  • Page 11 Please retain product label and instructions for future reference Step 20 Step 21 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 24 QTY 8 Parts needed - No. 36 Roof Inside the building place a closure trim Cut the felt into ve strips and lay (No.
  • Page 12 Please retain product label and instructions for future reference Step 22 Step 23 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 14 QTY 4 Parts needed - No. 3 QTY 1 No. 15 QTY 4 No.
  • Page 13 Please retain product label and instructions for future reference Step 27 Step 25 Parts needed - No. 22 QTY 1 No. 34 QTY 1 Once both parts of the hinge’s (No. 33) are secured into place Fix the garage door strip lift each door, ensuring the hook (No.
  • Page 14 Please retain product label and instructions for future reference Step 28 Parts needed - No. 23 QTY 10 Arrange the storm braces (No. 23) around the building (internally). Place 2x storm braces per side xing into place using 2x 90mm bolts per brace making sure the washer &...