Download Print this page

Mercia Garden Products 0644LOG186-V4 General Instructions Manual

5.5x4m reverse apex cabin (44mm)

Advertisement

Quick Links

General Instructions
0644LOG186-V4 (5.5x4m)
0644LOG186-V4: 5.5x4m Reverse apex cabin (44mm)
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0644LOG186-V4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0644LOG186-V4

  • Page 1 Winter = High Moisture = Expansion Summer = Low Moisture = Contraction erected by two adults 0644LOG186-V4 (5.5x4m) 0644LOG186-V4: 5.5x4m Reverse apex cabin (44mm) BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 0644LOG186-V4 Please retain product label and instructions for future reference Overall Dimensions: Width = 5536mm Log Board - 120x44x5500mm QTY 18 Depth = 4146mm LB44-A-5500 Height = 3269mm Base Dimensions: Log Board - 120x44x4000mm QTY 10 Width = 5318mm LB44-A-4000...
  • Page 3 Please retain product label and instructions for future reference Felt Roof Spacers QTY 5 Pre-assembly PI-07-0208 (20x100x2mm) *Please note: Nail Bag Each board interlocks at 40mm Screw x882 either end in a staggered pattern. 90mm Bolt Set x20 Before securing ensure that the boards 30mm Screw x108 120mm Screw x16 are tted properly in their respective...
  • Page 4 Please retain product label and instructions for future reference Step 2 Step 1 Parts needed - No. 19 QTY 2 Parts needed - No 19 QTY 2 No. 20 QTY 10 No. 20 QTY 10 Lay the bearers (No. 19 & No. Repeat Steps 5 &...
  • Page 5 Please retain product label and instructions for future reference Step 4 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 5 (See Pre-Assembly) Parts needed - No. 8 QTY 8 Parts needed - No. 9 QTY 12 No. 11 QTY 4 No.
  • Page 6 Please retain product label and instructions for future reference Step 7 Step 6 (See Window-Assembly) Parts needed - No. 1 QTY 8 Parts needed - No. 1 QTY 8 Ensure that the lip of the Refer to window assembly instructions to assemble window frame is located on the inside of the building .
  • Page 7 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 9 Step 8 (See Pre-Assembly) Parts needed - No. 3 QTY 2 Parts needed - No. 9 QTY 14 No. 10 QTY 42 Combine the two sections of the No.
  • Page 8 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 11 Step 10 (See Pre-Assembly) Parts needed - No. 21 QTY 5 Parts needed - No. 3 QTY 2 Align the Purlin (s) (No. 21) into the Place the gable tops onto the cut out slots on each gable top ensuring assembly.
  • Page 9 Please retain product label and instructions for future reference Step 13 Step 12 Parts needed - No. 22 QTY 4 Parts needed - No. 18 QTY 98 Ensuring the roof boards are ush Place the rst two roof boards at the overhanging side and meet (No.
  • Page 10 Please retain product label and instructions for future reference Step 14 Step 15 Roof Parts needed - No. 17 QTY 66 Parts needed - No. 25 QTY 9 Place the rst oor board (No. 17) Inside the building place the closure inside the building ush to the log trim (No.
  • Page 11 Please retain product label and instructions for future reference Step 18: Dormer Fit (optional) Step 17: Dormer Fit (optional) Parts needed - No. 4 QTY 1 Parts needed - No. 5 QTY 1 No. 6 QTY 1 Measure and mark along the roof following the position of the top Measure and mark along the roof following the position of the...
  • Page 12 Please retain product label and instructions for future reference Step 19: Felting Without Dormer Step 20: Felting the Dormer Parts needed - No. 27 Parts needed - No. 27 Cut the felt into seven strips and Cut the felt into three lay onto the roof in the order strips following the shape of the shown in the illustration.
  • Page 13 Please retain product label and instructions for future reference Step 21 Parts needed - No. 23 QTY 4 No. 24 QTY 2 Align the fascias (No. 23) with the roof and x into place using 3x40mm screws per fascia, making It is ESSENTIAL that you apply wood sure to screw through the treatment immediately after the building...