Trane TAMXB0A24V21DB Installation, Operation And Maintenance Manual page 20

Variable speed air handlers convertible 2 - 5 ton
Table of Contents

Advertisement

S S e e t t t t i i n n g g t t h h e e U U n n i i t t — — V V e e r r t t i i c c a a l l I I n n s s t t a a l l l l a a t t i i o o n n
Table 8. Plenum Installation
2.
Assemble the plenum using the plenum's Installer Guide.
On units with sheet metal returns: Return plenum must be flanged.
Sheet metal drill point screws must be 1/2" in length or shorter.
Table 9. Downflow Installation
Downflow installation must comply with national, state, and local
codes.
3.
Prepare the location site as appropriate for your application and
per national, state, and local code requirements.
4.
Set the unit in position.
20
Airflow
Typical Plenum Installation
Typical Downflow Installation
18-GJ89D1-1F-EN

Advertisement

Table of Contents
loading

Table of Contents