Download Print this page
Mercia Garden Products Groundsman Dutch Barn 8x8 General Instructions Manual

Mercia Garden Products Groundsman Dutch Barn 8x8 General Instructions Manual

Advertisement

Quick Links

General Instructions
01PTGRODB0808-V3
8x8 Groundsman Dutch Barn
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm
sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm
above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Groundsman Dutch Barn 8x8 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products Groundsman Dutch Barn 8x8

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 01PTGRODB0808-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 2446mm Window QTY 1 Depth = 2590mm Height = 2615mm AI-01OW-V1 Base Dimensions: Width = 2400mm Depth = 2388mm Door Cloaking Strip - 27 x 44 x 1670mm QTY 1 F2744-1670MM Before assembly please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Nail Bag Step 1 60mm Screw x 16 30mm Black Screw x 14 Lay the Door Panel and Gable Top on a level oor place the gable top on top of the 50mm Screw x 30 20mm Screw x 15 door panel ensure they are level at the top...
  • Page 4 Please retain product label and instructions for future reference Step 5 Step 3 Lay the plain back panel and the remaining Fix the door strips onto the front gable gable top on a level oor place the gable using 4x30mm screws for each strip. top on top of the plain back panel ensure they are level at the top then x together 4x30mm screws.
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 8 Pre drill Place the cover strip 13mm above Place oors on a rm and level base, ensure hole the gap in the window panel and base has suitable drainage free from areas x into place using 3x30mm screws.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 10 Step 12 Fix the door gable and Window panel using Fix the large roof panels using the same same method shown previously. method.
  • Page 7 Please retain product label and instructions for future reference Step 14 Step 16 Cut felt into 4 sheets at 2522mm and Fit fascia boards to the front and the lay onto roof as shown in diagram back of building using 3x40mm screws ensuring there is a 50mm overhang per board as shown in diagram.
  • Page 8 Please retain product label and instructions for future reference Step 18 Step 20 Place the Cloaking Strip to the Fix the casement stay to the rear of one of the doors. Fixing in window then align the xings position screwing through the door to the window panel.
  • Page 9 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...
  • Page 11 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...

This manual is also suitable for:

01ptgrodb0808-v3