Download Print this page

Mercia Garden Products 02DTSHDB0606SFD5W-V1-PEFC Assembly Instructions Manual

6x6 dutch barn playhouse

Advertisement

Quick Links

General Instructions
02DTSHDB0606SFD5W-V1-PEFC
6x6 Dutch Barn Playhouse
BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed in the parts list provided.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and a Drill with
2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
- Ensure you have enough time to build the product to ensure the building is water tight.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also
occur during excessive dry spells due to natural processes. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended
periods of hot weather and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guaran-
tee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress. Pressure Treated buildings - Require a waterproof treatment to prevent
water ingress. Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
We also recommend treating the building prior to construction.
POSITIONING YOUR PLAYHOUSE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
We recommend a minimum space of 2m around a playhouse, away from any structure or obstructions
such as fences, garages, houses, overhanging branches, washing lines or electrical wires.
It is recommended that the position of the Playhouse is not in direct sunlight.
Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or any
hard surface.
BUILDING A BASE
Ensure the base is level and is built on rm ground, to prevent distortion, checking with a spirit level. Refer
to diagrams for the base dimensions. The base should be slightly smaller than the external measurement of
the building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended
that the oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
- Wooden base.
WARNING: Only for domestic use
Not suitable for children under 36 months due to
small gaps and danger of falling from heights.
To be used under direct supervision of an adult
Please retain product label and instructions for future reference
WARNING
ONLY SUITABLE FOR DOMESTIC USE.
!
TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.
THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE
DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO THE INSTRUCTIONS.
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.
MAX AGE OF 14 YEARS.
THIS TOY IS FOR OUTDOOR USE ONLY.
USE A WATER BASED TREATMENT THAT IS EN71 TESTED
CAUTION
Wood is a natural product and can change post manufacture. So despite every e ort being
made to ensure the material used are cut and machined to a clean and smooth nish, care
must be taken when handling the product and preparing for use by your child.
Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a
smoother nish. Alternatively, call the customer service department who will be happy to
arrange replacement panels/parts.
x2
All buildings should be erected by
atleast two adults.
DO NOT ALLOW
CHILDREN TO ASSIST.
To prevent damage during
assembly, you MUST pilot
drill all screw holes and
ensure all screw heads are
2mm Drill bit
countersunk.
12mm CSK
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by
the correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels
and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium
dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
In all instances for assistance with your product, please contact customer care on :
01636 821215 or customerservice@merciagp.co.uk
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For ease of assembly, you will
need a tape measure to check
dimensions of components.
www.merciagardenproducts.co.uk
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 02DTSHDB0606SFD5W-V1-PEFC and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 02DTSHDB0606SFD5W-V1-PEFC

  • Page 1 In all instances for assistance with your product, please contact customer care on : TYPES OF BASE 01636 821215 or customerservice@merciagp.co.uk - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, - Wooden base. Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk...
  • Page 2 02DTSHDB0606SFD5W-V1-PEFC Please retain product label and instructions for future reference Look for the symbols and follow the safety guidlines below. Ensure screw heads are sub ush and Ensure the screws are 12mm gap sand down any xed squarely and do surrounding the splinters created.
  • Page 3 Please retain product label and instructions for future reference Pre Assembly Nail Bag Before assembling remove the transportation 50mm Screw x 46 30mm Black Screw x 14 blocks from the bottom of each panel. 40mm Screw x 24 20mm Screw x 26 Take care removing the blocks as to not damage the panels.
  • Page 4 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 1 Step 2 Parts needed - & & & Parts needed - & & & Pre drill Pre drill hole hole Fix the Window Blocks (No.
  • Page 5 Please retain product label and instructions for future reference Step 5 Step 3 Parts needed - & Parts needed - Pre drill Pre drill hole hole Place the Door Gable (No.1) and the Place the Floor (No. 4) on your rm and remaining Window Side (No.3) on top level base, ensure base has suitable of the oor, ensuring the panels are...
  • Page 6 Please retain product label and instructions for future reference Step 6 Step 7 Parts needed - & Parts needed - Pre drill Pre drill hole hole Locate the Roof Support Bar (No. 9) in Locate the Small Roofs (No. 6) on top of line with the central framing of the Door the playhouse on either side.
  • Page 7 Please retain product label and instructions for future reference Step 9 Step 8 Parts needed - Pre drill Pre drill Once the roof is tted and the building hole hole is square, secure the building to the Locate the Large Roofs (No. 5) on top of Floor, using 50mm screws in alignment the playhouse on either side of the Small with the oor joists.
  • Page 8 Please retain product label and instructions for future reference Step 11 Step 10 Parts needed - Parts needed - Pre drill Pre drill hole hole Locate the Cover Trims (No. 10) to Cut the Felt (No. 20) into 3 sheets of: each corner of the playhouse as 1935mm (L) X 1000mm (W) and lay onto shown.
  • Page 9 Please retain product label and instructions for future reference Step 12 Step 13 Parts needed - & Parts needed - Pre drill Pre drill hole hole Locate the Fascias (No. 11) centrally Position the Window Shutters (No.14) to the front and back of the around the windows on the sides of the playhouse, as shown in the illustration.
  • Page 10 Please retain product label and instructions for future reference Step 14 Parts needed - & & Pre drill hole Place a Window Cross (No. 13) against It is ESSENTIAL that you apply wood the inside of each window. Position the frame treatment immediately after the building centrally to the window and x using 4x20mm has been assembled.
  • Page 12 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...