Download Print this page

Advertisement

Quick Links

General Instructions
BUILDING CODE
8X8 OVERLAP APEX
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 8X8 OVERLAP APEX and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 8X8 OVERLAP APEX

  • Page 1 Winter = High Moisture = Expansion All building’s should be erected by two adults Summer = Low Moisture = Contraction BUILDING CODE 8X8 OVERLAP APEX BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2: Pre-Assembly

    01OVLPA0808DDFW-V1 & 01OVLPA0808DDFW-V1-NW Please retain product label and instructions for future reference Pre Assembly Overall Dimensions: Remove transportation Length = 2414mm Width = 2400mm blocks from the bottom Height = 2120mm 01OVLPA0808DDFW-V1 of each panel before Base Dimensions: beginning assembly. Each Length = 2350mm Panel should have two Width = 2360mm...
  • Page 3 Step 3 Step 1 Place oor on rm and level base, ensure Fix the corners with 50mm base has suitable drainage free from areas screws as shown in diagram. where water can collect. (See front page on 9x50mm Screws base requirements). Attach the oors using 10 x 40mm screws.
  • Page 4 Step 5 Step 7 Fix two eaves frames to each roof sheet Pre drill hole using 3x30mm screws per eave. Cut the felt into 2490mm long 40mm screw sheets and lay onto roof as Fix the roof sheets to the roof ensuring shown in diagram ensuring they come together at the top using there is overhang around the...
  • Page 5 Step 8 Step 10 Fit the Cover Trims to the front For the no window version go to step 11 Pre drill and back of the building as hole shown in the illustration using 30mm 30mm screws. Trim the length screw 30mm of the cover trims to the...
  • Page 6: After Treatment

    Step 11 Step 12 Fix the door strips to the Use 1x30mm screw to master door (right door) secure the turn button to using 5x20mm screws. the master door. If the strips are attatched to 30mm 1x30mm Black Screws the slave door the doors will screw not open properly.

This manual is also suitable for:

01ovlpa0808ddfw-v101ovlpa0808ddfw-v1-nw