Download Print this page

Mercia Garden Products 01DTPRMSHDB1008DDOP-V1 General Instructions Manual

Dip treated premium shiplap dutch barn 10x8 double door opening window

Advertisement

Quick Links

General Instructions
01DTPRMSHDB1008DDOP-V1
DIP TREATED PREMIUM SHIPLAP DUTCH BARN 10X8 DOUBLE DOOR OPENING WINDOW
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTPRMSHDB1008DDOP-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTPRMSHDB1008DDOP-V1

  • Page 1 It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding. For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, TYPES OF BASE Sutton On Trent, - Concrete 75mm laid on top of 75mm hard-core.
  • Page 2 01DTPRMSHDB1008DDOP-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 2539mm Door Cloaking Strip 27x44x1670mm QTY 1 Depth = 2970mm F2744-1670MM Casement Stay QTY 2 Height = 2626mm PI-07-0007 Base Dimensions: Width = 2350mm Door Strip 12x45x1449mm QTY 1...
  • Page 3 Please retain product label and instructions for future reference Nail Bag Step 2 Parts Needed- No.14 QTY 10 There may be extra screws present in the nail bag Locate the Floor Blocks (No.14) between the oor framing, ensuring they are 30mm Screw x 251 100mm Screw x 2 spaced equally.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 BACK Parts Needed- No.2 QTY 1 Parts Needed- No.4, (or 3) QTY 1 - No.3, (or 4) QTY 1 Locate the Window Panel (No.4) (or Side Panel) onto the oor, secure the panels at **Please note: These side panels are the corner using 3x50mm screws.
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 10 Parts Needed- No.6 QTY 2 Parts Needed- No.7 QTY 2 - No.8 QTY 2 Locate the Front Panels (No.6) onto the oor, secure the panels at the corners Lay the Gable tops (No.7 and No.8) along using 3x50mm screws per join.
  • Page 6 Please retain product label and instructions for future reference Step 12 Step 14 Parts Needed- No.28 QTY 2 Parts Needed- No.31 QTY 2 Locate the Gable Strips (No.28) onto the Measure and mark 42mm from the top 42mm join of the gable tops and front/back corner of the truss.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 17 Parts Needed- No.12 QTY 4 Place the Bottom roof panels (No.12) on - No.40 QTY 2 top of the gables and truss, ensuring they are correctly orientated with the U channel Locate the Bottom roof panels (No.12) slotted into the roof truss.
  • Page 8 Please retain product label and instructions for future reference Step 21 Step 19 Once the roof is xed, attach the Place the Top Roof Panels (No.11) on top building to the Floor with 50mm of the gables and truss, ensuring they are screws.
  • Page 9 Please retain product label and instructions for future reference Step 23 Step 25 Parts Needed- No.16 QTY 1 Parts Needed- No.15 QTY 1 - No.17 QTY 2 - No.30 QTY 2 Locate the Door Strips (No.16 & No.17) Place the Door Blocks (No.30) onto the around the door opening and ensure top of the door framing and ensure that they are ush with the framing.
  • Page 10 Please retain product label and instructions for future reference Step 27 Step 29 Parts Needed- No.39 QTY 2 Parts Needed- No.13 QTY 2 - No.18 QTY 2 Align the lock (No.39) to the door, ensuring - No.36 QTY 4 equal spacing across the doors and in line Place the Window Strip (No.18) 11mm above with the door framing.
  • Page 11 Please retain product label and instructions for future reference Step 30 Step 32 Parts Needed- No.32 QTY 2 Parts Needed- No.37 QTY 1 Fix the Casement Stay (No.32) to the opening Cut four strips of felt (No.37) to window then align the xings onto the 3050mm lengths and place onto the window panel frame.
  • Page 12 Please retain product label and instructions for future reference Step 33 Parts Needed- No.25 QTY 4 - No.27 QTY 4 Fix the Fascias (No.25 & No.27) to the front and rear of the building using 3x30mm screws per fascia. Ensure to screw through the boards into the framing.