Mercia Garden Products 01PTGRO1208DD-V3 General Instructions Manual

12x8 pressure treated groundsman

Advertisement

Quick Links

General Instructions
01PTGRO1208DD-V3
12x8 Pressure Treated Groundsman
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can
be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm
sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm
above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01PTGRO1208DD-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01PTGRO1208DD-V3

  • Page 1 TYPES OF BASE For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. Mercia Garden Products Limited, - Slabs laid on 50mm of sharp sand. Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 01PTGRO1208DD-V3 Please retain product label and instructions for future reference Fixing Kit Overall Dimensions: Width = 2430mm Depth = 3638mm Height = 2282mm Base Dimensions: Cover trims - 12 x 55 x 1652mm QTY 6 Fascias - 12 x 95 x 1480mm QTY 4...
  • Page 3 Please retain product label and instructions for future reference *SCREW COUNT PER WINDOW 30mm screw Place the opening window strip 11mm above the window gap in the window panel and x with 3x30mm screws. Pre Assembly 30mm Fix the door strips onto the front gable using 4x30mm screws for each strip Opening Window...
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 1 Window panel can be tted on Remove transportation blocks either left or right side Fix the corners with 50mm from the bottom of each panel screws as shown in diagram. before beginning assembly.
  • Page 5 Please retain product label and instructions for future reference Step 5 Step 7 Secure the rst 2 truss Fix the roof panels on either supports together with side as shown in diagram. 4x40mm screws as shown Ensure roof framing ts into slot in the illustration.
  • Page 6 Please retain product label and instructions for future reference Step 9 Step 11 Use 40mm screws to x Cut felt into 4 sheets and lay onto roof as shown in each fascia block, fascia and diagram ensuring there is a Shed Diamond.
  • Page 7 Please retain product label and instructions for future reference Step 13 Place the Cloaking Strip to the rear of one of the doors. Fixing in position screwing through the door It is ESSENTIAL that you apply wood treat into the cloaking strip with 3x30mm ment immediately after the building has screws.

Table of Contents