Chapter 2: Server Installation; 2-1 Overview; Unpacking The System; Preparing For Setup - Supero AS-1011M-UR User Manual

Supermicro as-1011m-ur servers: user guide
Hide thumbs Also See for AS-1011M-UR:
Table of Contents

Advertisement

2-1 Overview

This chapter provides a quick setup checklist to get your 1011M-UR up and run-
ning. Following these steps in the order given should enable you to have the
system operational within a minimum amount of time. This quick setup assumes
that your system has come to you with the processors and memory preinstalled. If
your system is not already fully integrated with a motherboard, processors, system
memory etc., please turn to the chapter or section noted in each step for details
on installing specifi c components.
2-2

Unpacking the System

You should inspect the box the 1011M-UR was shipped in and note if it was dam-
aged in any way. If the server itself shows damage you should fi le a damage claim
with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the 1011M-UR. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fi elds are generated. You will also need
it placed near a grounded power outlet. Be sure to read the Rack and Server
Precautions in the next section.
2-3

Preparing for Setup

The box the 1011M-UR was shipped in should include two sets of rail assemblies,
two rail mounting brackets and the mounting screws you will need to install the
system into the rack. Follow the steps in the order given to complete the installation
process in a minimum amount of time. Please read this section in its entirety before
you begin the installation procedure outlined in the sections that follow.
Chapter 2
Server Installation
2-1

Chapter 2: Server Installation

Advertisement

Table of Contents
loading

Table of Contents