Page 1
(440) 248-0400 www.keithley.com Introduction This guide contains information on S46 relay installation and system configuration that is necessary after installing new relays. WARNING The information in this section is only intended for qualified service personnel. Do not attempt to replace parts or otherwise service the equipment unless you are qualified to do so.
Page 2
Relay installation Before installing the relays, remove the screws that secure the S46 top cover, and then remove the cover. WARNING Disconnect the line cord and all cables from the S46 before removing the top cover. RELAY 1-8 installation 1. Unplug line cord, disconnect all cables, and remove the Top Cover.
Page 3
Figure 1 RELAY 1-8 installation Relay spacer screws Top cover Relay Spacer R 1 R SPDT relay mounting bracket S46 Chassis Screw (6 places) Figure 2 Connecting control wires to SPDT relay Black Wire Red Wire () Top view of SPDT Relay...
Page 4
RELAY A-D installation 1. Remove the four screws securing the cover plate over the mounting hole where the new relay is to be installed (see Figure 2. Connect the supplied ribbon cable to the relay securing it with the two 4-40X1/4PPHSEM screws. 3.
Page 6
System configuration After installing the new relays, you must program the S46 for the new relay configuration with the following command: :ROUT:CONF:CPOL <clist> <clist> is defined as follows: clist = (@0 | 3-6, 0 | 3-6, 0 | 3-6, 0 | 3-6, 0 | 1, ... 0 | 1) Relay: ...
Need help?
Do you have a question about the S46 and is the answer not in the manual?
Questions and answers