KTM 250 EXC Six Days TPI 2019 Owner's Manual page 144

Hide thumbs Also See for 250 EXC Six Days TPI 2019:
Table of Contents

Advertisement

18 SERVICE WORK ON THE ENGINE
142
Main work
Remove protection cap
E00917-10
Put throttle grip
E00819-11
Plug in wake-up connector
diagnostics connector
The combination instrument lighting is activated.
Info
The connector is included as part of the motorcycle's
separate enclosure.
Wait for at least five seconds.
Release the fixing means from the throttle grip.
The oil pump is timed.
Info
The oil pump is actuated at various speeds.
The procedure is clearly audible.
Wait until you can no longer hear the oil pump working.
Disconnect the wake-up connector from the diagnostics con-
nector.
E00918-10
Check whether air bubbles are visible in the hose
»
If air bubbles are visible:
Repeat the entire procedure until air bubbles are no
longer visible.
Mount protection cap on the diagnostics connector.
M01515-10
Finishing work
Mount the seat. (
1
of the diagnostics connector.
2
into full throttle position and secure.
3
for priming the oil pump to the
4
.
p. 80)
5
.

Advertisement

Table of Contents
loading

Table of Contents