Operating Position; Preparing The Boiler; Boring The Boiler Plate; Blast Tube Length - Riello 20074141 Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

5.4

Operating position

➤ The burner is designed to operate only in
positions 1 , 2 , 3 and 4 (Fig. 12).
➤ Installation 1 is preferable, as it is the only
one that allows the maintenance operations
WARNING
as described in this manual.
➤ Installations 2 , 3 and 4 permit operation but
make maintenance and inspection of the
combustion head more difficult.
➤ Any other position could compromise the cor-
rect operation of the appliance.
➤ Installation 5 is prohibited for safety reasons.
DANGER
5.5

Preparing the boiler

5.5.1

Boring the boiler plate

Pierce the closing plate of the combustion chamber, as in Fig. 13.
The position of the threaded holes can be marked using the ther-
mal insulation screen supplied with the burner.
5.5.2

Blast tube length

The length of the blast tube must be selected according to the in-
dications provided by the manufacturer of the boiler, and in any
case it must be greater than the thickness of the boiler door com-
plete with its fettling.
The refractory can have a conical shape (minimum 60°).
For boilers with front flue passes 1) (Fig. 14) or flame inversion
chamber, a protection in refractory material 5) must be inserted
between the boiler fettling 2) and the flame funnel 4).
This protective fettling must not compromise the extraction of the
blast tube.
For boilers with a water-cooled front piece, a refractory lining 2)-
5)(Fig. 14) is not necessary, unless expressly requested by the
boiler manufacturer.
5.6

Securing the burner to the boiler

Prepare a suitable lifting system using rings 3)
(Fig. 14).
➤ Fit the heat insulation supplied onto the blast tube (4)
(Fig. 14).
➤ Fit the entire burner onto the boiler hole prepared previously
(Fig. 13), and fasten with the screws supplied.
The seal between burner and boiler must be
airtight.
WARNING
20080128
Installation
1
mm
RS 310/M MZ
RS 410/M MZ
RS 510/M MZ
RS 610/M MZ
20072025
20
GB
2
3
4
D7739
D455
A
B
335
452
335
452
335
452
350
452
5
Fig. 12
Fig. 13
C
M18
M18
M18
M18
Tab. I
Fig. 14

Advertisement

Table of Contents
loading

Table of Contents