Installation Preparations - Huawei OceanStor 5110F V5 Quick Installation Manual

Table of Contents

Advertisement

1 Installation Preparations

1a
Checking installation tools
The following installation tools are required:
 Phillips screwdriver (M3 to M6)
 Flat-head screwdriver (M3 to M6)
 Diagonal pliers
 Floating nut mounting bar
Checking components
1c
Only materials used in the installation process are listed here. The Packing List contains all materials required by the installation. The bag
containing the Packing List is attached to the outside of the carton.
Installation template
(for 2 U devices)
Floating nut and M6 screw
A storage system power failure may cause devices connected
to the same circuit breaker to power off unexpectedly.
Therefore, ensure that the storage system power supplies
have functioning circuit breakers with the following amps:
AC power: not smaller than 10 A
Controller enclosure (2 U)
Disk enclosure (2 U)
Front panel of a 2 U device
Mini SAS HD optical cable
1b
Checking circuit breakers
NOTICE
Adjustable guide rails
Multi-mode optical fiber
cable
3
Serial cable
Network cable

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OceanStor 5110F V5 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Oceanstor 5300f v5Oceanstor 5500f v5V500r007

Table of Contents