Installation Preparations - Huawei OceanStor 5110 V5 Quick Installation Manual

Table of Contents

Advertisement

1 Installation Preparations

1a
Checking installation tools
The following installation tools are required:
 Phillips screwdriver (M3 to M6)
 Flat-head screwdriver (M3 to M6)
 Diagonal pliers
 Floating nut mounting bar
Checking components
1c
Only materials used in the installation process are listed here. The Packing List contains all materials required by the installation. The bag
containing the Packing List is attached to the outside of the carton.
Each controller of the OceanStor 5110 V5/5300 V5 is equipped with four GE electrical ports. Each controller enclosure of the OceanStor 5500
V5 is equipped with four SmartIO ports that do not support IP Scale-out networking. The following sections describe the process for installing
the OceanStor 5500 V5. The process for installing the OceanStor 5110 V5/5300 V5 is similar.
5110 V5 does not support high-density disk enclosures.
Controller enclosure (2 U)
Disk enclosure (2 U)
Installation template (for
4 U devices)
Installation template
Front panel of a
(for 2 U devices)
2 U device
Ground cable
Mini SAS HD electrical
Floating nut and M6 screw
cable
Front panel of a 4 U
device
Mini SAS HD optical
cable
Multi-mode optical fiber
1b
Checking circuit breakers
NOTICE
A storage system power failure may cause devices connected to the
same circuit breaker to power off unexpectedly. Therefore, ensure
that the storage system power supplies have functioning circuit
breakers with the following amps:
 AC power: not smaller than 10 A
 DC power (not applicable to 5110 V5): not smaller than 30 A for
controller enclosures, not smaller than 18.5 A for disk enclosures
Disk enclosure (4 U)
High-density disk enclosure (4 U)
Cable tray
Adjustable guide rails
Network cable
cable
3
Ball bearing guide rails
Serial cable

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents