5 PRE-OPERATION SETTINGS AND PROCEDURE
(2) Procedure up to CC-Link data link
Load the Master and Local modules to the base units.
Check that the Master and Local modules operate independently.
(Hardware test)
Connect the remote modules and GOT with CC-Link dedicated cable.
Set the station number switches of the A8GT-J61BT15.
Switch on the GOT, remote modules and Master module in this order.
Confirm the connection status of each module. (Line test)
Write a communication program for monitoring by Cyclic transmission.
When performing monitoring in the dedicated command monitor method,
create a sequence program that will execute the dedicated commands.
5 - 2
Start
Install the GOT to the control box.
Write a parameter setting program.
Start data link and monitor data on the GOT.
Complete
Get other manuals https://www.bkmanuals.com
MELSEC-GOT
⋅⋅⋅⋅⋅Refer to the Master
module user's manual.
⋅⋅⋅⋅⋅Refer to the user's manual
of the GOT used
⋅⋅⋅⋅⋅Refer to the Maste module
user's manual.
⋅⋅⋅⋅⋅Refer to Section 5.5
⋅⋅⋅⋅⋅Refer to Section 5.2
Refer to the Maste module
user's manual.
5
5 - 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

900 seriesA8gt-j61bt15A8gt-j61bt13

Table of Contents