Mitsubishi 800 Series User Manual page 23

Type cc-link communication module, graphic operation terminal
Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

4 MONITORING SPECIFICATION
When the GOT internal device read command is executed
PLC CPU
TO
FORM
2)
Master
station
RWw
Read command
5)
RWr
Read data
1) Write the data (such as operation command data) from GOT
to the GOT internal device.
2) Using the sequence program, store the read command data
to the remote register (RWw).
3) When the GOT request flag is turned on, the read com-mand
data is stored in the GOT remote register(RWw),
and the data in the specified GOT internal device is read to
the remote device(RWr).
4) By link scan, the data is stored in the remote device(RWr)
of the GOT allocated to the master station.
5) Using the sequence program, read the remote device(RWr)
data to the PLC CPU.
Repeat the above steps and execute the read commands,
then read several information to the PLC CPU.
4 - 5
GOT
Repeat storing the read command data, and read from
GOT internal device data.
RWw
3)
Read command
RWr
Read data
4)
Get other manuals https://www.bkmanuals.com
MELSEC-GOT
GOT internal device
GD
3)
Read data1 (Operating
command data)
Read data2 (Operating
command data)
Read data3 (Operating
command data)
1) Set the operation specification
data with GOT.
Touch switch function
and numeric value
input function
Planned quantly selling
Line2
Line3
Line4
Line5
PartsA
100
200
300
100
PartsB
100
0
0
250
50
0
0
PartsC
PartsD
300
0
0
0
4 - 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

900 seriesA8gt-j61bt15A8gt-j61bt13

Table of Contents