Kohler K-29918T-NSHC Installation Instructions Manual

Wall-hung toilet
Hide thumbs Also See for K-29918T-NSHC:

Advertisement

Quick Links

BEFORE YOU BEGIN
BEFORE YOU BEGIN
·
Please read these instructions carefully to familiarize
yourself with the required tools, materials, and installation
sequences. Follow the sections that pertain to your
particular installation. This will help you avoid costly
mistakes. In addition to proper installation, read all
operating and safety instructions.
·
All information in these instructions is based upon the
latest product information available at the time of
publication. Kohler China reserves the right to make
changes in product characteristics, packaging, or
availability at any time without notice.
·
These instructions contain important care, cleaning, and
warranty information -
consumer
.
·
Fixture dimensions are nominal and conform to tolerances
established by ASME Standards (A112.19.2-2018).
·
The product complies with Q/KCI-006-2018 and GB
25502-2017.
ORDERING INFORMATION
Veil WH Toilet W/O Seat
(HT300 P, 3.0/4.5) .........................................K-29918T-NSHC
Veil Bowl ......................................................K-5723T-HC
Hydro-tower 300 PNE IWT
(HC, 3.0/4.5L) ...................................K-20010T-VLWP-NA
C3 Toilet Seat With Bidet Functionality (Not Provided)
SAFETY WARNINGS
Kohler products are precision-engineered and should give
continued superior and safe performance, provided:
1. They are installed, commissioned, operated and
maintained in accordance with the recommendations given
in this Manual.
2. Periodic attention is given, as necessary, to maintain the
product in good functional order. Recommended
guidelines are given in the
Carefully inspect the new fixture for any signs of damage.
When installing Kohler Products, manufacturers guidelines for
power tool safety should be followed.
No.2 KOHLER ROAD, SANSHUI CENTRAL INDUSTRIAL PARK, LEPING TOWN, SANSHUI DIST., FOSHAN, GUANGDONG, PRC POST CODE 528137
8# MENGSHAN RD, ECONOMIC DEVELOPMENT ZONE OF HUANTAI, ZIBO, SHANDONG, CHINA
NO.1 KOHLER STREET, ECONOMIC DEVELOPMENT ZONE OF FAKU COUNTY, SHENYANG LIAONING PROVINCE, PRC
1461371-T01-B
please leave instructions for the
MAINTENANCE
section.
·
·
·
·
2018)
·
Q/KCI-006-2018 GB 25502-2017
..............................................K-29918T-NSHC
300
3.0/4.5
...........................................K-20010T-VLWP-NA
C3
1.
2.
2
528137
8
256410
1
110400
©
Copyright Kohler China Investment Co., Ltd. 2021
-1-
©
VEIL
INSTALLATION INSTRUCTION
WALL-HUNG TOILET
3.0/4.5
K-29918T-NSHC
ASME
(A112.19.2-
...................................K-5723T-HC
(
)
POST CODE:
256410
POST CODE:
-
:
110400
2021

Advertisement

Table of Contents
loading

Summary of Contents for Kohler K-29918T-NSHC

  • Page 1 When installing Kohler Products, manufacturers guidelines for power tool safety should be followed. No.2 KOHLER ROAD, SANSHUI CENTRAL INDUSTRIAL PARK, LEPING TOWN, SANSHUI DIST., FOSHAN, GUANGDONG, PRC POST CODE 528137 528137 8# MENGSHAN RD, ECONOMIC DEVELOPMENT ZONE OF HUANTAI, ZIBO, SHANDONG, CHINA...
  • Page 2: Specification

    · Screwdriver · · Sponge · · Sealant ROUGHING-IN Reference Value UNIT mm 285 385 Fig.#1 Kohler reserves the right to change marked dimensions without prior notice. SPECIFICATION Plumbing Connections Recommended inlet connections are 1/2 BSP. " 1/2" BSP 1461371-T01-B...
  • Page 3: Installation

    INSTALLATION 3/4.5L Recommended tanks for 3/4.5L In-wall Tank K-20010T-VLWP-NA (w/o iron rank) And In-wall K-20010T-VLWP-NA( Tank plate K-23056T-*, K-20341T-PNE-*, K-75890T-PNE-*, K-23056T-* K-20341T-PNE-* K-75890T-PNE-* K- K-23055T-PNE-*. (Need separate purchase for plate) 23055T-PNE-* Fig.#2 Install the Toilet 1. Install Flushing Mechanism · ·...
  • Page 4 2. Set The Spacing Of The Bowl After you install the tank, be careful to set the spacing of the bowl on wall according to the dimensions as shown. Unit: mm Carrier Studs 25 2 Fig.#4 3. Attach Connection Pipe 3.1.
  • Page 5 3.3. As shown, pull the inlet pipe of the Bidet seat through the 3.3. bowl and connect it to the valve hose connector on the iron rack. Pull the plug of the Bidet seat through the bowl and connect it to the socket on the iron rack and then fix the Bidet seat.
  • Page 6: User Maintenance

    CAUTION: Don t use any cement while installing the toilet. Heat expansion of the toilet may damage the feet of the toilet. Kohler will not be responsible for any damage because of using cement. WARNING: Risk of product damage. Do not throw into the toilet what is easy to block it, such as newspaper, paper pilch, sanitary towel.
  • Page 7: Before You Begin

    Kohler will not be responsible for any damage related to above mentioned cleanser or solvent. Mild detergent can be used. Do not apply spares that are not provided by Kohler, and please note that glass adhesive tape shall not be applied to the installation of Kohler spares.
  • Page 8: Specifications

    Design And Installation Concept Of In-wall Tank Installation of in-wall tank is much easier and nice-looking comparative to that of traditional tank. Meanwhile, the space layout will be more reasonable due to the application of in-wall tank pipes and connectors. The most remarkable advantage of in-wall tank is that the installation will never be limited to certain area, and can be installed wherever as you wish, which will make the bathroom layout more reasonable and nice-looking, and make good use of every inch of the bathroom space.
  • Page 9 Elbow Drain outlet 110mm 110mm A B C Water Tank Water Bracket Tank Discharge Bracket Elbow Discharge Elbow Drain outlet 110mm, welding Drain outlet 90mm, welding 110mm 90mm Kohler reserves the right to change marked dimensions without prior notice. 1381424-T01-B...
  • Page 10 INSTALLATION Way of Installation In-wall tank with frame In-wall Tank With Frame Installation For In-wall Tank With Frame Cover A. Installation of In-wall Tank 1. Remove in-wall tank from packing box. Remove cover board inside water tank first as shown. Then remove support block and plug above bracket assembly.
  • Page 11 3. Drill four holes with diameter of 10mm and depth of 80mm Bulge Screw with churn drilling as shown. A. Fill the bulge nail into the instruction hole on the wall, fix Mounting the fixing frame to the bulge nail, adjust the gasket and Bracket tighten the nut.
  • Page 12 2. Connect tap water braided tube on the top of water tank for water supply as shown. Water Pipe Connecting Pipe Note: 1. Ensure water tank internal valve is OFF. 2. Suggestion: connect a temporary rubber or plastic hose on valve, flush water supply pipeline. Ensure water is clean, no residual sand stone or fouling inside pipeline.
  • Page 13 Method three: 6. According to different faceplates,there are different Method two: Remote installation Method one: installations of access panel as below. Remote plate installation of mask Press from front Suggested faceplate Suggested faceplate installation area installation area 1) K-20341T-PNE/K-75890T-PNE Access Panel Installation Methods: R1000mm R1000mm...
  • Page 14 2) K-23055T-PNE access panel installation and installation At least 80mm gap reserved hole size 80mm 2) K-23055T-PNE There is only remote installation with K-23055T-PNE, Pinch Plate During remote installation, fix the cover onto the tank Adjust length of and pull the air hose to the panel. Reserve access panel pinch plate in accordance with at front to ensure removal and installation of cover.
  • Page 15 2. As is shown, fix the EPE block onto the drain hole and inlet hole. Water Inlet Drainage Hole EPE Block Water Tank Bracket 3. As shown, remove the EPE after finishing the wall. Screw in the long screw as desired. Eliminate unwanted mask with a sharp knife, if there is mask.
  • Page 16 3. Install the big and small leak-proof gaskets on inlet pipe and outlet pipe ,then install it to corresponding pipes on the toilet tank. Small Leak-proof Gasket Inlet Pipe Drainage Pipe Big Leak-proof Gasket 4. As shown, pull the inlet pipe of the Bidet seat through the bowl and connect it to the valve hose connector on the iron rack.
  • Page 17: Faceplate Installation

    E. Faceplate Installation According to different faceplates, there are different faceplate installations as below: Locknut 1. K-20341T-PNE/K-75890T-PNE installation Fixing Lock 1. K-20341T-PNE/K-75890T-PNE Supporting Board When tighten four locknuts on supporting board, adjust to "OPEN" mark as shown. OPEN 2) Tighten four screws to "LOCK" mark after installing supporting board as shown.
  • Page 18 4) It is ready to use when connected to water supply after installation. Note: Reserve access panel at front of the tank in Full Flush Button remote installation. Half Flush Button 2. K-23055T-PNE installationn 2. K-23055T-PNE Suggested faceplate fixed frame installation direction Air Hose Connect air hose to faceplate from water tank Faceplate...
  • Page 19 3. K-23056T/K-23056TW installation 3. K-23056T/K-23056TW Low-voltage AC 1) Transformer Installation Ceiling Fix the transformer onto the wall, as illustrated, the output connector of transformer(with 2 core female Brushing Pipe connector) through the tube(suggestion: tube inner dia. 16~ 20) into tank. Connect the input terminal of transformer(black) with power supply 220V/110V AC.
  • Page 20 C. Install air pump to faceplate, connect emergency Slot A flush air hose to outlet pipe in faceplate. Connect output signal cable and input signal cable together, Slot B and tighten nut. Rib A Rib B Ribs on air pump should be assembled into slots on faceplate (A-A/B-B) Input Signal Cable...
  • Page 21 REMOVE AND MAINTENANCE OF THE OUTLET VALVE REMOVE AND MAINTENANCE OF THE OUTLET VALVE 1. Remove the air hoses of the big flush and small flush. Then remove the faceplate. Faceplate Faceplate Connect to air hose 2. Pay special attention when dismantle supporting board 4 lock nuts, all bolts shall align with "OPEN"...
  • Page 22 5. Push aside the pivot snaps of the big flush and small flush towards upper right to make the lever and pivot apart. Hold Snap (Locked) bracket top by hand and then lift up to unlock the bracket. Note: Push aside the pivot snaps of the big flush and small flush towards lower left to fix back the bracket.
  • Page 23 10. Pull discharge valve along the arrow direction as shown to remove discharge valve. Outlet Valve 11. Remove discharge valve as shown and then take valve out for cleaning. Outlet Valve Filter A. Wash Filtration Net Filtration Net Close corner valve first, then loosen and take out the Tighten tighten nut, and wash the waste on filtration net with clean water.
  • Page 24: Troubleshooting Procedures

    TROUBLE SHOOTING PROCEDURES TROUBLE SHOOTING PROCEDURES Symptoms Probable Causes Recommended Action The inlet valve is closed. Open inlet valve. Floating box of inlet valve is blocked by other parts. Readjust the position of other parts to avoid No water fills in via inlet contacting the floating box when it is valve functioning.

Table of Contents