Kohler K-29918T-NSHC Installation Instructions Manual page 16

Wall-hung toilet
Hide thumbs Also See for K-29918T-NSHC:
Table of Contents

Advertisement

3. Install the big and small leak-proof gaskets on inlet pipe
and outlet pipe ,then install it to corresponding pipes on the
toilet tank.
3.
4. As shown, pull the inlet pipe of the Bidet seat through the
bowl and connect it to the valve hose connector on the iron
rack. Pull the plug of the Bidet seat through the bowl and
connect it to the socket on the iron rack and then fix the
Bidet seat.
4.
5. 48mm-58mm of the long screw shall be reserved outside
the wall as shown in the illustration. if the long screw
outside the wall is not long enough or much longer than
that needed, it should be adjusted with screwdriver or by
hand. Then apply lubricant to drainage pipe and limber
pipe to ensure a smooth installation.
Note: 1. Make sure the leakage protection of the valve and
Bidet seat plug is turned on before bowl installation;
2. Do not get caught with the hose and wire of the Bidet
seat during bowl installation.
5.
1.
2.
6. Install the toilet as shown in the illustration, and use a spirit
level to ensure the lavatory to remain level.
6.
7. Install the reserved lock, gasket, hexagonal nut and
decoration cap onto long screw according to the order
shown in the illustration.
Note:
Please refer to the installation instructions of toilet.
7.
1381424-T01-B
Small Leak-proof Gasket
48mm-58mm
Reversed Lock
Hexagonal Nut
-10-
Inlet Pipe
Drainage Pipe
Big Leak-proof Gasket
48mm-58mm
Lubricant
Long Screw
Gasket
Decoration Cap
Long Screw
Spirit Level

Advertisement

Table of Contents
loading

Table of Contents