Download Print this page

Casit EQ2009 Manual

Control box gate's opening

Advertisement

Quick Links

Stab.: Strada Pietra Alta 1 – C.a.p. 10040 CASELETTE (TO) Italy
ISO 9001:2008
Cert. n. 3614/4
Quality System Certified
Cancelli Automatici
GB
CONTROL BOX GATE'S OPENING - 2 MOTORS SINGLEPHASE 230VAC WITH ENCODER
OPERATION PROGRAMS
With the combination of the mini DIP switches it is possible to program the gate's operation and of the auxiliary services.
STEP BY STEP, SEMIAUTOMATIC, AUTOMATIC, DEAD-MAN, PEDESTRIAN, SHORT CLOSING IMPULS, TIMER, SLOW-
DOWN MOTORS, POWER STARTING, TEST PHOTOCELLS, MOTORS INDIPENDENT OR UNIFIED, MEMORISATION OF
WORK'S TIME, REVERSE, OPERATION TYPE B.
Warning ! To enter a new program, the control box must be zero set in order to allow the storage of the new instructions replacing
the previous one. For such purpose it is possible to follow two different procedures:
1) set the wanted instructions through the programming devices (DIP) cut out the supply voltage for a few seconds and then
switch-on the supply voltage. The control box must effect one cycle complete and then is ready.
2) set the wanted instructions and effect a new cycle complete. After the one cycle (opening-closing) the control box is ready.
FUNCTIONS:
STEP BY STEP (S2 DIP 2 OFF) at every impulsion of start the control box :open-stop-close-open
SEMIAUTOMATIC (S2 DIP 2 ON) at every impulsion of start the control box open.for the closing it is necessary another impulsion
of start. (S1 DIP1 OFF) or automatically (S1 DIP1 ON).
AUTOMATIC (S2 DIP 1 OFF, DIP 2 ON, S1 DIP 1 ON) At every impulsion of start the control box open.
Then close automatically After the adjusted time.
DEAD-MAN (S2 DIP 1 ON, S1 DIP1 OFF, DIP 3 OFF) push bottons separate. When the push bottons are pushed, the motors runs
when are released ,the motors stop. The limit switches are in function.
PEDESTRIAN it is possible to open, partially, the gate, (see the planning menu) and after the cycle is effected following the
program selected by the DIP. During the pedestrian closing the photocell opens the gate.The closing-time is equal to the total work's
time,so that the gate can close fully.
SHORT CLOSING IMPULS (S1 DIP 6 ON) at every opening-start (when the gate is closed) the motors runs in closing (few instant)
to permit the easier release of the electrolock, then the motors runs in opening.
TIMER it possible to connect a timer to opening the gate for the time during the contact of the timer is activated S2 DIP 1 OFF, DIP
2 ON, S1 DIP 1 ON DIP 3 ON. ON.When the contact of the timer is released,the gate close after the time selected.
SLOW-DOWN-MOTORS it is possible to set the slow down motor in opening and closing during the planning , but 2 sec. before the
closing,the motors have max. power for an easy locking of the electrolock (S2 DIP 3 ON).
The speed of deceleration can be regulated with control power P6.
The moment in which the slow-down starts can be differentiated between the opening and the closure.
POWER STARTING at every impulsion of start the motors start at the max. power for 3 sec and then, runs at the power adjusted by
P1 e P4.
TEST PHOTOCELLS (S3 DIP 1 e DIP 2 PLUGS 32-33) at every cycles the control box verify if the photocell's receiver is in
fonction.
MOTORS INDEPENDENTS OR UNIFIED (S1 DIP 5) the motors can have the work's time independent (double sliding, double
barrier etc..) also the operation of the limit switches is independent of each (S1 DIP 5 OFF adjust P1 e P4), the pedestrian works
on 1 motor only. Or the motors can have the work's time unified (2 motors on a garage door ,etc..).So, only one limit switch stop the
two motors (S1 DIP 5 ON adjust P1 ), the pedestrian works on both motors.
MEMORISATION OF WORK'S TIME the control box memorize the time of opening and closing. So, the motors runs for the right
time +few seconds. And if the gate re-open when is in closing the motors not runs for a long time.
REVERSE (S3 DIP 4 OFF) survey obstacle along the run of the gate (see chapter 10).
OPERATION TYPE B (S3 DIP 3 ON ) it trains the card for signal clinking and it changes the work formality of the input Safety
edge 1 and 2.
INSTALLATION 2 MOTORS IN THE ONE LEAF (ex.garage door-big swing):
To connect the 2 motors one to the plug M4 and the second to the plug M5. Select the Dip-switch S1 ON "working time unified for
the 2 motors on M1" and follow the program for one motor (chap. 8.1)
WORKS SHAFTS WITH ENCODER ( shafts dip-switch S4)
EMERGENCY MANOEUVRE working dead-man with the exception of safety (Chapter 12).
TECHNICAL SPECIFICATIONS
Control unit power: 230VAC Hz 50/60
Accessories power: 24 VAC - 500 mA (the sum absorptions clamps 32-33-34 e 29-30)
Electrolock power: 12 VAC - 1 A
Line fuse F1 5A,
fusibile signal clinking F2 1A
Box standard version dimensions:255x200x105mm (size of the special version could change)
Do not use with motor over 350w: slow-down-motors, power starting, reverse.
When the control panel is used with the relays or teleruptors connected to the output motor for powers
motors up to 350W, regulate the push motor (P1 and P4) to the maximum power.
Before installing, thoroughly read this manual that is an integral part of this Kit. Casit declines any
responsibility in the event current standards in the country of installation are not complied with
Page 1 of 14
Tel. +39 011 9688230–170–930
Partita IVA 0050659.001.7
C.C.I.A.A. 333122 - M: T0024777
Email:
info@casit.it
Email pec: direzione@pec.casit.it
Shed
EQ2009
Motor output: 2 x 500W (tryac 16A - Relais motor max 10°)
Environmental operatine temperature: -15°C / + 60°C
Fax +39 011 9688363
Reg. Trib. Torino N.654/62
Web: www.casit-italy.com
Infissi
Telecomandati
R 1.6 R 1.8
WARNING!
EQ2009 R 1.6 1.8
MADE IN ITALY
IP Grad: 54
Rev. 02 del 2/05/2011

Advertisement

loading
Need help?

Need help?

Do you have a question about the EQ2009 and is the answer not in the manual?

Questions and answers

Saad
May 16, 2025

هل يمكنني الحصول على فديو توضيحي لطريقة برمجة الباب وضبط وقت فتح واغلاق الباب

User image 6827cff07c795

Subscribe to Our Youtube Channel

Summary of Contents for Casit EQ2009

  • Page 1 350W, regulate the push motor (P1 and P4) to the maximum power. Before installing, thoroughly read this manual that is an integral part of this Kit. Casit declines any responsibility in the event current standards in the country of installation are not complied with Page 1 of 14 EQ2009 R 1.6 1.8...
  • Page 2 SET; it marks the regular operation of the microprocessor of the control panel with some green continuous lightning during the work. Page 2 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 3: Electric Connections

    Clean contact of the 2° channel of the radioreceiver on the connection J1 RX. WARNING : The inputs N.C. not used they must obligatorily be short-circuits toward the commune of the entries Page 3 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 4 OFF Working with 1 motor on M1 (type sliding gate or 1 leaf). Admittance to the planning menu. DIP 10 OFF Disposition of the control panel in work condition. Page 4 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 5 The pushes button PS1s (START), PS2 (Pedestrian), PS3 and the leds L14, L15, L16 are used for the formulation of the parameters in the planning menu (see chapter 8). Page 5 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 6 If the gate is closed pass over the following point. REV 1 REV 2 (red) (red) The leds will visualize beside the state. REV 1 (red) REV 2 Page 6 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 7 (green) Subsequently the control panel will be ready again in the initial REV 1 planning menu turning on fix red light the led REV 1. (red) REV 2 Page 7 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 8 If the leaf is already completely open because abdicates the deceleration, send a short impulse with the key PS1 to pass over the following point, REV 1 REV 2 (red) (green) (green) Page 8 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 9 (green) Subsequently the control panel will be ready again in the initial planning menu turning on fix red light the led REV 1. REV 1 (red) REV 2 Page 9 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 10 Subsequently the control panel will be ready again in the initial planning menu turning on fix red light the led REV1 and REV 2. REV 1 REV 2 (red) (red) Page 10 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 11: Terminal Block M1

    Not be used with motors with encoders The card of management flashing LAMP has to be connected to the control panel EQ2009 through the insertion of the 6 poles cable in the connector J2. The card LAMP has terminal block for the connection of the loads with the following order TERMINAL BLOCK M1 Output signal clinking in closing.
  • Page 12 10) SURVEY OBSTACLE The control panel EQ2009 has a survey obstacle independent circuit for every motor, that has the function to notice the presence of obstacles along the stroke of the gate. WARNING! During the memorization of the time of work the survey obstacle is not active The survey obstacle function can be excluded maintaining S3 dip 4 ON.
  • Page 13: Troubleshooting

    N.B.: If the problem persists, contact your supplier or the installer. WARNING: Before sending a radiotransmitter to be repaired, check that the batteries are flat. 50% of all radiotransmitters that return for servicing only have flat batteries. Page 13 of 14 EQ2009 R 1.6 1.8 Rev. 02 del 2/05/2011...
  • Page 14 Nor does the warranty cover parts subject to wear (batteries, oil etc.). Products returned to Casit for repair shall only be accepted carriage paid. Casit shall return the repaired product to the sender carriage forward.