CONTROL BOX GATE'S OPENING - 2 MOTORS SINGLEPHASE 230VAC
GB
OPERATION PROGRAMS
With the combination of the mini DIP switches it is possible to program the gate's operation and of the auxiliary services.
STEP BY STEP, SEMIAUTOMATIC, AUTOMATIC, DEAD-MAN, PEDESTRIAN, SHORT CLOSING IMPULS, TIMER, SLOW-
DOWN MOTORS, POWER STARTING, TEST PHOTOCELLS, MOTORS INDIPENDENT OR UNIFIED, MEMORISATION OF
WORK'S TIME, REVERSE, OPERATION TYPE B.
Warning ! To enter a new program, the control box must be zero set in order to allow the storage of the new instructions replacing
the previous one. For such purpose it is possible to follow two different procedures:
1) set the wanted instructions through the programming devices (DIP) cut out the supply voltage for a few seconds and then
switch-on the supply voltage. The control box must effect one cycle complete and then is ready.
2) set the wanted instructions and effect a new cycle complete. After the one cycle (opening-closing) the control box is ready.
FUNCTIONS:
STEP BY STEP (S2 DIP 2 OFF) at every impulsion of start the control box :open-stop-close-open.......
SEMIAUTOMATIC (S2 DIP 2 ON) at every impulsion of start the control box open.for the closing it is necessary another impulsion
of start. (S1 DIP1 OFF) or automatically (S1 DIP1 ON).
AUTOMATIC (S2 DIP 1 OFF, DIP 2 ON, S1 DIP 1 ON) At every impulsion of start the control box open.
Then close automatically After the adjusted time.
DEAD-MAN (S2 DIP 1 ON, S1 DIP1 OFF, DIP 3 OFF) push bottons separate. When the push bottons are pushed, the motors runs
when are released ,the motors stop. The limit switches are in function.
PEDESTRIAN it is possible to open, partially, the gate, (see the planning menu) and after the cycle is effected following the
program selected by the DIP. During the pedestrian closing the photocell opens the gate.The closing-time is equal to the total work's
time,so that the gate can close fully.
SHORT CLOSING IMPULS (S1 DIP 6 ON) at every opening-start (when the gate is closed) the motors runs in closing (few instant)
to permit the easier release of the electrolock, then the motors runs in opening.
TIMER it possible to connect a timer to opening the gate for the time during the contact of the timer is activated S2 DIP 1 OFF, DIP
2 ON, S1 DIP 1 ON DIP 3 ON. ON.When the contact of the timer is released,the gate close after the time selected.
SLOW-DOWN-MOTORS it is possible to set the slow down motor in opening and closing during the planning , but 2 sec. before the
closing,the motors have max. power for an easy locking of the electrolock (S2 DIP 3 ON). Do not use with motor over 350W. The
speed of deceleration can be regulated with dip-switch 9 S1, DIP9 ON high speed, DIP 9 OFF low speed.
The moment in which the slow-down starts can be differentiated between the opening and the closure.
POWER STARTING (S2 DIP 4 ON, S1 DIP 6) at every impulsion of start the motors start at the max. power for 1,5 sec (S1 DIP 6
OFF) or for 3 sec. (S1 DIP 6 ON) and then, runs at the power adjusted by P1 e P4.
TEST PHOTOCELLS (S3 DIP 1 e DIP 2 PLUGS 32-33) at every cycles the control box verify if the photocell's receiver is in
fonction.
MOTORS INDEPENDENTS OR UNIFIED (S1 DIP 5) the motors can have the work's time independent (double sliding, double
barrier etc..) also the operation of the limit switches is independent of each (S1 DIP 5 OFF adjust P1 e P4), the pedestrian works
on 1 motor only. Or the motors can have the work's time unified (2 motors on a garage door ,etc..).So, only one limit switch stop the
two motors (S1 DIP 5 ON adjust P1 ), the pedestrian works on both motors.
MEMORISATION OF WORK'S TIME the control box memorize the time of opening and closing. So, the motors runs for the right
time +few seconds. And if the gate re-open when is in closing the motors not runs for a long time.
REVERSE (S3 DIP 4 OFF motor 1, S3 DIP 5 OFF motor 2) survey obstacle along the run of the gate (see chapter 7).
OPERATION TYPE B (S3 DIP 3 ON ) it trains the card for signal clinking and it changes the work formality of the input Safety
edge 1 and 2.
INSTALLATION 2 MOTORS IN THE ONE LEAF (ex.garage door-big swing):
To connect the 2 motors one to the plug M4 and the second to the plug M5. Select the Dip-switch S1 ON "working time unified for
the 2 motors on M1" and follow the program for one motor (chap. 6.1)
TECHNICAL SPECIFICATIONS
Control unit power:
Motor output:
Accessories power:
Electrolock power:
Environmental operatine temperature:
Warning !
Do not use with motor over 350w: slow-down-motors, power starting, reverse.
When the control panel is used with the relays or teleruptors connected to the output motor for powers motors up to 350W,
regulate the push motor (P1 and P4) to the maximum power.
Before installing, thoroughly read this manual that is an integral part of this Kit. Casit declines any
responsibility in the event current standards in the country of installation are not complied with
Page 1 of 14
Stab.: Strada Pietra Alta 1 – C.a.p. 10040 CASELETTE (TO) Italy
Tel. 011/9688230 - 9688170 Fax 011/9688363 –
Partita IVA 0050659.001.7
Reg. Trib. Torino N.654/62 - C.C.I.A.A. 333122 - M: T0024777
Sito
www.casit.it
Shed
230VAC Hz 50/60
2 x 500W
24 VAC - 500 mA (the sum absorptions clamps 32-33-34 e 29-30)
12 VAC - 1 A
-5° C / + 60 ° C
E-Mail
info@casit.it
Infissi Telecomandati
EQ2006
(tryac 16A - Relais motor max 10° )
WARNING!
EQ2006 R.1.5
Rev. 02 dated 09/11/2007

Advertisement

loading
Need help?

Need help?

Do you have a question about the EQ2006 and is the answer not in the manual?

Questions and answers

Summary of Contents for Casit EQ2006

  • Page 1 (P1 and P4) to the maximum power. WARNING! Before installing, thoroughly read this manual that is an integral part of this Kit. Casit declines any responsibility in the event current standards in the country of installation are not complied with Page 1 of 14 EQ2006 R.1.5...
  • Page 2 Input N.O. of REARMAMENT. It becomes the input of rearmament of the control panel after the intervention of Safety edge 1 in the operation type B (S3, dip 3 ON). Page 2 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...
  • Page 3 It set the sensibility to the obstacle while motor 2 is working. working. It set the sensibility to the obstacle while motor 1 is It set the sensibility to the obstacle while motor 2 is slowing down. slowing down. Page 3 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...
  • Page 4 DIP 8 OFF The output light of courtesy is disarmed three minutes later than the end of closing. DIP 9 They are not used. DIP 10 They are not used. Page 4 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...
  • Page 5: Default Times

    6 sec. if the slowing is not used and 12 sec. if slowing is working. On demand pin cod EQ2006/S2 with 3 and 6 sec. of compensation times. 6) MENU OF PLANNING The working on of every plant always foresees the work times of the automation know-how, the time-break when gate is open if the automatic closing is trained and.
  • Page 6 (green) (green) (green) Subsequently the control panel will be ready again in the initial REV 1 planning menu turning on fix red light the led REV 1. (red) REV 2 Page 6 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...
  • Page 7 If the leaf is already completely open because abdicates the deceleration, send a short impulse with the key PS1 to pass over the following point, REV 1 REV 2 (red) (green) (green) Page 7 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...
  • Page 8 (green) (green) (green) Subsequently the control panel will be ready again in the initial planning menu turning on fix red light the led REV 1. REV 1 (red) REV 2 Page 8 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...
  • Page 9 Subsequently the control panel will be ready again in the initial planning menu turning on fix red light the led REV1 and REV 2. REV 1 REV 2 (red) (red) Page 9 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...
  • Page 10: Terminal Block M1

    Usable as signalings according to the directives or as traffic light to signal the state of the gate The card of management flashing LAMP has to be connected to the control panel EQ2006 through the insertion of the 6 poles cable in the connector J2.
  • Page 11 7) SURVEY OBSTACLE The control panel EQ2006 has a survey obstacle independent circuit for every motor, that has the function to notice the presence of obstacles along the stroke of the gate. WARNING! During the memorization of the time of work the survey obstacle is not active The survey obstacle function can be excluded maintaining S3 - dip 4 ON and S3 - dip 5 ON.
  • Page 12: Troubleshooting

    Remove current to the plant for any the condition of triac TH1 (pilot second and subsequently fit the motor 1) or TH2 (pilot motor 2) in control panel EQ2006 damage. The photocell, if present, is Check, clean the photocell or obstructed or not functioning.
  • Page 13 Nor does the warranty cover parts subject to wear (batteries, oil etc.). Products returned to Casit for repair shall only be accepted carriage paid. Casit shall return the repaired product to the sender carriage forward.
  • Page 14 Page 14 of 14 EQ2006 R.1.5 Rev. 02 dated 09/11/2007...