Install The Motorized Valve - Yolink YS4909-UC Installation & User Manual

Valve controller 1
Hide thumbs Also See for YS4909-UC:
Table of Contents

Advertisement

Install the Motorized Valve

Q
Preparing for installation:
Determine the installed location of your new
motorized valve. Please consider these factors
when choosing the location for the motorized
valve:
This location must be within reach of the
cables of the Valve Controller 1 (see Install
the Valve Controller 1 section, on page 13.
Ensure that there is physical room for the
valve, that other pipes, a wall or other
objects will prevent installing it at the
desired location.
The manual control knob and Open/Shut
indicator window should be visible and
accessible.
Please note, the valve can be installed in
any orientation; sideways, inverted, etc.
Local plumbing or building codes may
require a non-electronic means of water
shut-off. If this is the case, or if in doubt on
the requirements, install the motorized valve
in line (before or after) the existing shut-off
valve (ball valve, etc.)
28

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the YS4909-UC and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ys4909s-uc

Table of Contents