Yolink YS4909-UC Installation & User Manual page 21

Valve controller 1
Hide thumbs Also See for YS4909-UC:
Table of Contents

Advertisement

Install the Bulldog Valve Robot,
K
Continued
6. Keeping the center axis of the Valve Robot's
motor shaft aligned with the ball valve shaft, as
indicated by the red dashed line, reinsert and
tighten the tab slot screw.
If it is not possible to align the parts as shown,
or if the bracket can not be secured to the ball
valve, consider rotating the ball valve handle
180°. After removing the Bulldog, this can be
done by removing the ball valve handle, and then
reinstalling it on the other side. Reinstall the
Bulldog (on the other side of the ball valve) and
check if alignment is better in this position.
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the YS4909-UC and is the answer not in the manual?

This manual is also suitable for:

Ys4909s-uc

Table of Contents