Installing The Cutting Deck; Installing The Drive Belt - Toro ProLine 30139 Operator's Manual

37” recycler for mid-size traction unit
Table of Contents

Advertisement

Installation

Installing the Cutting Deck

1.
Position the cutting deck under the carrier frame.
2.
Mount the cutting deck to the carrier frame with
four (4) clevis pins and hairpin cotters (Fig. 6).
Note:
All four pins must be in the same hole
locations to prevent uneven cutting.
1
2
3
4
5
6
7
10
11
Figure 6
1. 2" (51 mm) Cut Height
2. 2-1/2" (64 mm) Cut Height
3. 3" (76 mm) Cut Height
4. 3-1/2" (89 mm) Cut Height
5. 4" (102 mm) Cut Height
6. 4-1/2" (114 mm) Cut
Height
8
8
9
7. 5" (127 mm) Cut Height
8. Clevis Pin
9. Carrier Frame
10. Cutting Deck
11. Hairpin Cotter

Installing the Drive Belt

1.
Remove the deck cover from the top of the
cutting deck.
2.
Install the drive belt around the traction unit
drive pulley and the top pulley on the left
spindle. The belt must be to the left of the belt
guide (Fig. 7).
1
Figure 7
1. Traction Unit Drive Pulley
2. Drive Belt
2
3
4
3. Belt Guide
4. Top Left Spindle Pulley

Advertisement

Table of Contents
loading

This manual is also suitable for:

895001

Table of Contents