Lcd Setting - Growatt SPF 5000T DVM-MPV User Manual

Off grid solar inverter split phase 4kw-12kw
Table of Contents

Advertisement

LCD Setting

After pressing and holding ENTER button for 3 seconds, the unit will enter setting mode. Press "UP" or "DOWN"
button to select setting programs. And then, press "ENTER" button to confirm the selection or ESC button to
exit.
Setting Programs:
Program
Output source priority:
01
To configure load
power source priority
Maximum charging
current: To configure total
charging current for solar
and utility chargers.
02
(Max. charging current =
utility charging current +
solar charging current)
18
Description
Setting Option
Solar energy provides power to the loads as first priority.
If solar energy is not sufficient to power all connected loads,
battery energy will supply power the loads at the same time.
Utility provides power to the loads only when any one condition
happens:
- Solar energy is notavailable
- Battery voltage drops toeither low-level warning voltage orthe
setting point in program12.
Utility first (default)
Utility will provide power to the loads as first priority.
Solar and battery energy will provide power to the loads only
when utilitypower is not available.
Solar energy provides power to the loads as first priority.
If solar energy is not sufficient to power all connected loads,
battery energy will supply power to the loads at the same time.
Utility provides power to the loads only when battery voltage
drops to either low-level warning voltage or thesetting point in
program 12.
12KW model: default 80A, 10A~180A Settable
10KW model: default 80A, 10A~160A Settable
8KW model: default 80A, 10A~150A Settable
6KW model: default 80A, 10A~140A Settable
5KW model: default 80A, 10A~130A Settable
4KW model: default 80A, 10A~120A Settable
(If Li is selected in program 5, this program can‟t be set up)
Solar first
SBU priority

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents