This user's guide describes the characteristics, operation, and use of the INA310EVM. This EVM is designed
to evaluate the performance of the INA310x. Throughout this document, the terms evaluation board, evaluation
module, and EVM are synonymous with the INA310EVM. This document includes a schematic, reference printed
circuit board (PCB) layouts, and a complete bill of materials (BOM).
SBOU284 – APRIL 2023
Submit Document Feedback
ABSTRACT
Copyright © 2023 Texas Instruments Incorporated
INA310EVM User's Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INA310EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments INA310EVM

  • Page 1 INA310EVM User’s Guide ABSTRACT This user’s guide describes the characteristics, operation, and use of the INA310EVM. This EVM is designed to evaluate the performance of the INA310x. Throughout this document, the terms evaluation board, evaluation module, and EVM are synonymous with the INA310EVM. This document includes a schematic, reference printed circuit board (PCB) layouts, and a complete bill of materials (BOM).
  • Page 2: Table Of Contents

    Table of Contents www.ti.com Table of Contents General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines..........Overview....................................5 1.1 Kit Contents..................................5 1.2 Related Documentation From Texas Instruments......................2 Hardware....................................2.1 Features..................................... Operation....................................7 3.1 Quick Start Setup................................3.2 Measurements...................................
  • Page 3: General Texas Instruments High Voltage Evaluation (Ti Hv Evm) User Safety Guidelines

    General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines WARNING Always follow TI's set-up and application instructions, including use of all interface components within their recommended electrical rated voltage and power limits.
  • Page 4 General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines www.ti.com WARNING While the EVM is energized, never touch the EVM or its electrical circuits, as they could be at high voltages capable of causing electrical shock hazard.
  • Page 5: Overview

    EVM kit. Contact Texas Instruments' customer support center if any component is missing. Table 1-2. Kit Contents ITEM QUANTITY INA310AEVM or INA310BEVM test board SBOU284 – APRIL 2023 INA310EVM User’s Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 6: Related Documentation From Texas Instruments

    Overview www.ti.com 1.2 Related Documentation From Texas Instruments This user's guide is available from the TI website under literature number SBOU284. Any letter appended to the literature number corresponds to the document revision that is current at the time of the writing of this document.
  • Page 7: Operation

    When in latch mode, SW1 can be moved to the reset position to clear the alert. The switch will then automatically return to the latch position. When the comparator threshold is reached, LED D1 will turn on. SBOU284 – APRIL 2023 INA310EVM User’s Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 8: Circuitry

    Switch SW1 is used to put the comparator in either latch or transparent mode. When in latch mode, SW1 can be moved to the reset position to clear the alert. The switch will then automatically return to the latch position. INA310EVM User’s Guide SBOU284 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 9: Schematics, Pcb Layout, And Bill Of Materials

    LBL2_5 Label Text PCB Label INA310A1 INA310A2 INA310A3 INA310A4 INA310A5 THT-14-423-10 Size: 0.65" x 0.20 " INA310B1 INA310B2 INA310B3 INA310B4 INA310B5 Figure 5-1. INA310 Schematic SBOU284 – APRIL 2023 INA310EVM User’s Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 10 £ Assembly Note These assemblies must comply with workmanship standards IPC-A-610 Class 2, unless otherwise speci e d. ¤ Figure 5-2. INA310 Hardware Schematic INA310EVM User’s Guide SBOU284 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 11: Pcb Layout

    PCB layers of the EVM. Figure 5-3. SENS095 Top View Figure 5-4. SENS095 Top Layer Figure 5-6. SENS095 Bottom Layer Figure 5-5. SENS095 Bottom View SBOU284 – APRIL 2023 INA310EVM User’s Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 12: Bill Of Materials

    Grade 0, 0402 SW1_1, SW1_2, Switch Slide ON ON Mom DP3T Top SW1_3, SW1_4, Slide 0.3A 6VDC PC Pins Thru-Hole SW_13MM00_3MM60 JS207011CQNR C&K SW1_5 Bulk INA310EVM User’s Guide SBOU284 – APRIL 2023 Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 13 Fiducial mark. There is nothing to FID1, FID2, FID3 buy or mount. R1_1, R1_2, R1_3, CRA2512-FZ- 0.01 RES, 0.01, 1%, 3 W, 2512 2512 Bourns R1_4, R1_5 R010ELF SBOU284 – APRIL 2023 INA310EVM User’s Guide Submit Document Feedback Copyright © 2023 Texas Instruments Incorporated...
  • Page 14 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 15 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 16 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 17 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 18 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 19 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...

This manual is also suitable for:

Ina310aevmIna310bevm

Table of Contents