1. Secure the short legs to the bottom sections as de-
scribed.
2. Place the upper section in position on top of the lower
oven.
3. Attach the stacking brackets using the remaining
5/16" bolts shipped with the ovens.
4. Attach the draft diverter to the bottom oven. DO NOT
install the draft diverter guard on the bottom oven.
5. Install the flue riser on the top oven. The bottom of
the flue riser slides down over the draft diverter on the
bottom oven. Secure with 12 screws.
6. Install the flue riser guard as shown below.

OVEN LEVELING

After assembly, the oven should be leveled and moved to
the operating location.
1. The oven can be leveled by adjusting the feet or cast-
ers located on the bottom of each leg.
Flue Riser Guard
Flue Riser
Draft Diverter
Zephaire-100-G-ES Shown
Figure 5
6
Flue Riser
Stacking
Brackets

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zephaire-200-g-es

Table of Contents