Overview

This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in order given should enable you to have your chassis setup and
operational within a minimal amount of time. This quick set up assumes that you are
an experienced technician, famailiar with common concepts and terminology.
2-2

Warnings and Precautions

You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well venilated. Avoid areas where heat,
electrical noise and eletromagnetic fields are generated.
You will also need it placed near at least one grounded power outlet. When con-
figured, the SC936 chassis includes two power supplies. "R" models a redundant
power supply and require two grounded outlets.
2-3

Preparing for Setup

The SC936 Chassis includes a set of rail assemblies, including mounting brackets
and mounting screws you will need to install the system into a rack. Please read
this manual in its entirety before you begin the installation procedure.
2-4

Electrical Safety Precautions

Basic electrical safety precautions should be followed to protect yourself from harm
and the SC936 from damage:
Be aware of the locations of the power on/off switch on the chassis as well as
the room's emergency power-off switch, disconnection switch or electrical outlet.
If an electrical accident occurs, you can then quickly disconnect the power from
the system.
Chapter 2
System Safety
2-1

Chapter 2 System Safety

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc936a-r900bSc936e1-r900bSc936e2-r900b

Table of Contents