Download Print this page

Curtis Primo Cappuccino PCGT5DV User Manual page 8

Dispensing system

Advertisement

INSTALLATION INSTRUCTIONS
Setting Up 120/220 Volt Units for 220-240 Volt Operation
WARNING: Do not connect the power cord to the
power supply until instructed to do so.
8
Remove the top and left side covers to expose the
terminal block.
9
Loosen the strain relief on the back of the unit.
10 Disconnect the existing power cable from the terminal
block and remove.
11 Disconnect and cap the jumper wire between the "C"
and "N" terminals on the terminal block.
12 Feed the 220-240 Volt power cable through the
strain relief, into the unit. The unit may be wired for
connection directly to a junction box or for use with a
power plug that connects to an electrical outlet meeting
the SPECIFICATIONS.
13 Connect the wires on the power cable to the terminal
block inside the unit according to the ELECTRICAL
SCHEMATIC.
14 Tighten the strain relief and replace the covers.
Connecting the Wiring (Units That Come from the
Factory Without a Power Cord Attached)
WARNING: Do not connect the power cord to the
power supply until instructed to do so.
Units With Power Connector Mounted to the Back
15 Connect a C20 IEC power cord (not supplied)
compatible with the electrical outlet installed in the
Units With Strain Relief Mounted to the Back
16 Remove the top and left side covers to expose the
terminal block.
17 Loosen the strain relief on the back of the unit.
continued...
Power
cable
Strain
relief
Terminal
block
II22
Style may vary
Style may vary
090919C

Advertisement

loading