Download Print this page

ABSCO SHEDS GCPSN2 Manual page 16

Gable carport

Advertisement

GUTTER AND DOWNPIPE
TR25
RWG06
FLASHING & CAPPING
Absco Industries
Assembly Instruction Manual
ABSCO GABLE CARPORT
MODEL: GCPSN2
3.0mW x 6.0mD x 2.66mH
RWG18
TR22
Cutout for downpipe
drop at back edge of
gutter.
Bend down the two arms
of the bracket over the
back edge of the gutter.
TR22
TR12
Fit barge capping TR12 to the front and rear gables, fixing
where there is a purlin beneath it using tek screws with neo
washers.
Lay the ridge capping TR08 centrally on the roof, overlapping
the sections to make the same length as the roof sheeting.
Safely fix the capping to every second rib with neo teks.
1.
Attach end caps and join lengths
of gutter TR22, to match the length
of the edge beam by notching the
roller edge of one to allow the other
to slide into it.
Put silicone in the joint and then
use rivets, FAST009, to fasten the
sections together.
2.
Repeat this for the other side.
3.
Mark the rectangular cutout to suit
the downpipe drop RWG18 at the
end you select.
4.
Remove material and fix RWG18
with silicone and rivets.
5.
Mark a line 110mm down from the
top of the edge beam at both ends.
6.
Run a string line between these
marks. This is a reference to align
the bottom position of the gutter
brackets, RWG06.
7.
RWG06 are to be fixed to the
edge beam at either end and spaced
equally along the length.
You may adjust bracket height to
allow for a slight fall to the downpipe
position.
8.
Fit gutter onto all brackets at
once. Push top of bracket into outer
roll of gutter and bend small support
arm down to hold the inner face.
9.
Rivet the brackets to the gutter
through the bottom hole of each
bracket.
10.
Fit downpipes to drops with
silicone and rivets. Secure to posts
with two downpipe straps bent to
suit.
Model: GCPSN2
8/6/23
16

Advertisement

loading