Removal And Replacement: Water Reservoir & Bin Control - Scotsman FME1504 User Manual

Fme1504 and nme1254 series
Hide thumbs Also See for FME1504:
Table of Contents

Advertisement

NME1254 & FME1504
REMOVAL AND REPLACEMENT: Water Reservoir & Bin Control
WATER RESERVOIR
1. Shut off the water supply to the ice machine.
2. Remove front panel.
3. Remove reservoir cover.
4. Disconnect water inlet tube from reservoir inlet
fitting.
5. To remove float valve, push in "locking tabs" as
shown and pull float up.
Note: The plunger/seat is available separately as
a part.
6. To remove reservoir, pull up and remove water
sensor.
8. Disconnect water outlet tubes.
9. Remove mounting screws from reservoir
bracket, and remove reservoir from ice machine.
10. Reverse to reassemble.
SLIDE BIN
CONTROLS IN
AND OUT
FLOAT
ASSEMBLY
LOCKING
TABS
ICE
BIN CONTROLS (Ice Level Sensors)
CHUTE
1. Disconnect electrical power.
2. Remove front panel.
3. Remove control box cover.
4. Locate ice chute, at the base of the chute, in
front of and behind it are two plastic bin control
mounts.
5. Slide each bin control to the left, and in the
control box, disconnect the electrical leads
connecting the bin control to the circuit board.
6. Reverse to reassemble, be certain that the bin
controls are aligned so that the ice level sensors
are visible (centered) through the holes in the ice
chute.
June 2002
Page 22
Water
Sensor

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents