Installation; Location - ESAB LAF 1001 Instruction Manual

Hide thumbs Also See for LAF 1001:
Table of Contents

Advertisement

4 INSTALLATION

4
INSTALLATION
The installation must be carried out by a professional.
NOTE!
Mains supply requirements
This equipment complies with IEC 61000-3-12 provided that the short-circuit power is
greater than or equal to S
the public system. It is the responsibility of the installer or user of the equipment to
ensure, by consultation with the distribution network operator if necessary, that the
equipment is connected only to a supply with a short-circuit power greater than or
equal to S
scmin
4.1

Location

WARNING!
Secure the equipment - particularly
if the ground is uneven or sloping.
Place the welding power source on a level foundation.
Make sure there is nothing to prevent the cooling.
Lifting instructions
0449 503 101
at the interface point between the user's supply and
scmin
. Refer to the technical data in the TECHNICAL DATA chapter.
- 9 -
© ESAB AB 2023

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Laf 1001m

Table of Contents