Diagonal Rail Installation - Peco Estate 795003 Operator's Manual

Hide thumbs Also See for Estate 795003:
Table of Contents

Advertisement

Diagonal Rail Installation

Position the Diagonal Rail (Item #1) over the Vertical Rail Assembly and Side Panel aligning the bolt holes of these
parts. Refer to Figure A.
Secure the Diagonal Rail relatively loose by using (2) 5/16"-18 x 3/4" Carriage Bolts (Item #2) on the top and bottom
Rail, (2) 5/16"-18 x 1" Carriage Bolts (Item #3) on the middle of the rail and (4) 5/16"-18 Flange Nuts (Item #4). Refer
to Figure A.
Repeat the same procedure for the other side. Make sure all hardware are secured relatively loose.
Note: Some parts and part features have been hidden from view for visual clarity.
Figure A
Side Panel
Vertical
Rail
11

Advertisement

Table of Contents
loading

Table of Contents