Download Print this page

Current Arize Element L1000 Gen2 Installation Manual page 8

Horticulture led lighting system

Advertisement

Arize Element
L1000 Gen2
®
Installation Steps for Perpendicular 90° Universal Mounting Kit
1
First determine which 2 slots on
the metal bracket most closely
correspond to the structural
member width. Insert strap of
the worm drive clamp through
the first slot of the metal
bracket from the top.
Attach a carabiner to each
4
side of the metal bracket.
1.6 Installation with Custom Brackets
2
Place the metal bracket on
top of the structural member
and wrap the strap around
the bottom of the structural
member and back up through
the second slot.
Attach a support cable to each
5
carabiner and ensure the gates
are closed.
A
A
LED.com
© 2023 Current Lighting Solutions, LLC. All rights reserved. GE and the GE monogram are trademarks of the
General Electric Company and are used under license. Information and specifications subject to change
without notice. All values are design or typical values when measured under laboratory conditions.
3
Secure the metal bracket on
to the top of the structural
member by inserting the
strap into the open end of the
clamp and tightening down
the screw.
Attach other end of cables
6
to light module. Ensure hook
gates are closed.
If you choose to use your own
custom mounting method, attach
to points A.
Installation Guide
Page 8 of 15
(Rev 06/20/23)
HORT158 | DOC-2000991

Advertisement

loading

Related Products for Current Arize Element L1000 Gen2