General Instructions
01PTGRODB1008-V4
10x8 Groundsman Dutch Barn
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy or
extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment
to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions,
The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap
the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding
ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instruction pages for your speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01PTGRODB1008-V4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01PTGRODB1008-V4

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 01PTGRODB1008-V4 Please retain product label and instructions for future reference Overall Dimensions: Length = 3055mm Fascia Board - 12x95x739mm Width = 2590mm S1295-G-739mm QTY 4 Height = 2603mm Tower Bolt QTY 2 PI-07-0030 Base Dimensions: Length = 2998mm Width = 2388mm...
  • Page 3 01GRODB1008-V3 Please retain product label and instructions for future reference Step 3 Step 1 Fix the door strips (No. 13 & No. 14) onto the Lay the Door Panel (No. 1) and Gable Top (No. 5) front gable using 4x30mm screws for each strip on a level oor place the gable top on top of the door panel ensure they are level at the top 12x30mm Screws...
  • Page 4 Please retain product label and instructions for future reference Step 7 Step 5 Pre drill Place the window strip 13mm (No.16) Lay the plain back panel (No. 4) and the remaining hole gable top (No. 5) on a level oor place the gable above the gap in the window panel and top on top of the plain back panel ensure x into place using 3x30mm screws.
  • Page 5 Please retain product label and instructions for future reference Step 10 Step 8 Following the same method outlined Place oors (No. 7) on a rm and level base, in step 9, attach the next plain side ensure base has suitable drainage free from (No.
  • Page 6 Please retain product label and instructions for future reference Step 14 Step 12 Once the roof is xed secure Place the sml roofs (No. 8) onto the gables the building to the oor with as shown in the illustration with the 36x50mm screws.
  • Page 7 Please retain product label and instructions for future reference Step 18 Step 16 Fix the barge boards (No. 16 Fix the cover trims (No. 12) around & No. 17) to the front of the the building (as shown in the building using 3x20mm screws illustration) securing each trim per board.
  • Page 8 Please retain product label and instructions for future reference Step 22 Step 20 Attach the turn buttons (No. 24) to the To x the lock (No. 21) in place. Screw the top and bottom of the slave door using Staple to the Door Gable or Slave door. 1x30mm screw per turn button.
  • Page 9 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...
  • Page 11 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...