Download Print this page
Mercia Garden Products 01PTPOT0806-V1 General Instructions Manual

Mercia Garden Products 01PTPOT0806-V1 General Instructions Manual

8x6 pressure treated pottng shed

Advertisement

Quick Links

General Instructions
01PTPOT0806-V1
8x6 Pressure Treated Pottng Shed
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01PTPOT0806-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01PTPOT0806-V1

  • Page 1 TYPES OF BASE For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, - Concrete 75mm laid on top of 75mm hard-core. Sutton On Trent, - Slabs laid on 50mm of sharp sand.
  • Page 2 01PTPOT0806-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 2515 mm Depth = 1900 mm Angled cut cover trim - 12X45X2046mm QTY 2 - S1245-G-2046MM Height = 2141 mm Base Dimensions: Glazed Roof Fascia - 12X88X1272mm QTY 2 -...
  • Page 3: Pre-Assembly

    Please retain product label and instructions for future reference Step 1 Pre Assembly Place oor on a rm and level base, ensure Before assembling remove the transportation base has suitable drainage free from areas blocks from the bottom of each panel. where standing water can collect.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Fix side panel using step 2 method. Fix the second set of panels using same method shown in Place the gable tops into position step 2. as shown in diagram and x using 10 x 50mm screws 50mm screws 15 x 50mm screws...
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 Position glazed roof panel on Place the roof panels on top of side gable and up against top ensuring the underside the gable top. Secure to gable strip roof is at the top side top with 40mm screws and to of the building.
  • Page 6 Please retain product label and instructions for future reference Step 12 Step 10 Cut felt into two sheets ensuring Fix Cover trims using 30mm they are both long enough to screws as shown. Pre drill holes cover roof with 50mm overhang to avoid splitting.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 14 Place Bench on top of supports and x in place using Fix casement stay to glazed roof using 16mm 50mm screws from the bottom up through the supports black screws.
  • Page 8 Please retain product label and instructions for future reference Step 16 Fix Padbolt using 30mm screws. Then x turn buttons to top and bottom of the door using 16mm black screw 10 x 30mm screws 2 x 16mm black screws 30mm 16mm Pre drill...
  • Page 10 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...