During Operation; Maintenance Tasks - Wilo Atmos GIGA-I Installation And Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

en
2.6

During operation

2.7

Maintenance tasks

44
The procedure described in the installation and operating in-
structions for shutting down the product/unit must be strictly
observed.
Disconnect the device from the mains and secure it against be-
ing switched on again without authorisation.
All rotating parts must be at a standstill.
Close the gate valve in the inlet and in the pressure pipe.
Provide adequate aeration in enclosed spaces.
Make sure that there is no risk of explosion when carrying out
any type of welding work or work with electrical devices.
The operator must immediately notify the person in charge of
every fault or irregularity.
If hazardous defects occur, the operator must immediately de-
activate the device. Hazardous defects include:
Malfunction of safety and monitoring devices
Damage to housing parts
Damage to electrical equipment
Collect any leakage of fluids and operating fluids immediately
and dispose of it according to the locally applicable guidelines.
Tools and other objects should only be kept in their designated
places.
Wear protective equipment:
Sealed safety goggles
Safety shoes
Safety gloves for protection against cuts
Locally applicable laws and regulations on work safety and ac-
cident prevention must be complied with.
The procedure described in the installation and operating in-
structions for shutting down the product/unit must be strictly
observed.
Only perform the maintenance work described in these installa-
tion and operating instructions.
Only original parts from the manufacturer may be used for
maintenance and repairs. The use of any non-original parts re-
leases the manufacturer from any liability.
Disconnect the device from the mains and secure it against be-
ing switched on again without authorisation.
All rotating parts must be at a standstill.
Close the gate valve in the inlet and in the pressure pipe.
Collect any leakage of fluid and operating fluid immediately and
dispose of it according to the locally applicable guidelines.
Store tools at the designated locations.
After completing work, reattach all safety and monitoring
devices and check that they function properly.
Installation and operating instructions • Wilo-Atmos GIGA-I/-D/-B • Ed.01/2023-06

Advertisement

Table of Contents
loading

This manual is also suitable for:

Atmos giga-dAtmos giga-b

Table of Contents