Download Print this page

Ferroli GN2 N Operating, Installation And Maintenance Instructions page 5

High-efficiency cast iron boiler for liquid fuels and/or gas

Advertisement

GN2 N
D
D
Connect the panels together, using the screws 1, the washers 2 and the nuts 3,
reinforcing the bottom parts using the blades 4 fastened with the screws 5.
E
Loosen the nuts "A".
F
Insert the side fastening bracket "A" between nuts "A" and "B".
A
B
G
G
Fit the side to the bracket "A" and fasten it using the screws "B" (right side view). Repeat the
operations in point G for the left side.
H
Fasten the sides to the rear wall "A" using the screws "B".
I
Unwind the hydrometer capillary tubing and tighten its connector to the sheathing on the front
of the boiler body.
L
Fit the wiring protection case "A" using the screws "B" on the sides.
M
M Fit the control panel to the sides using the tabs "A". Place the
reinforcement spring "B" between the head of the screw and
the tab.
A
P
Supplied By www.heating spares.co Tel. 0161 620 6677
B
A
H
A
B
A
Q
P
Fit the upper panel "A".
Q
Fit the top cover or covers "A", according to the length of the boiler (see table 1, sequence C).
B
A
E
I
N
N Insert the 3 bulbs (safety thermostat, boiler thermostat and
thermohydrometer).
O Fit the lower front panel "A".
B
A
F
B
A
L
O
A
5

Advertisement

loading