Tartup Procedure; Able Installation; Perational Readiness Check - ADS-tec OPC5015 User Manual

Table of Contents

Advertisement

Industrial PCs OPC5015
4.2 C

ABLE INSTALLATION

The device interfaces and power supply plug are found on the side or the back of the
casing. Care should be taken not to damage the pins when connecting the plugs.
4.3 S

TARTUP PROCEDURE

4.4 O

PERATIONAL READINESS CHECK

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
Connect the cable for serial / parallel data transfer and fasten the plugs to the sockets.
Connect all further required cables and secure against slippage.
Connect the power cable to the power source.
Check the device to determine whether hidden damages have been caused by
improper transport, incorrect operation or storage conditions or improper handling
(e.g. smoke emission from the device, etc.). If damages are found, immediately
shut down the device and protect it against unintentional startup.
For 24 V DC device:
sleeves of the power cable wires in the terminals.
Place
the
cable
end
13