8 Piping installation

In this chapter

8.1 Preparing water piping

8.1.1 Water circuit requirements

EPRA08~12EAV3+W1 + ETBH/X12EF6V+9W
Daikin Altherma 3 H MT W
4P634885-1 - 2021.03
8.1
Preparing water piping ...........................................................................................................................................................
8.1.1
Water circuit requirements ...................................................................................................................................
8.1.2
Formula to calculate the expansion vessel pre-pressure......................................................................................
8.1.3
To check the water volume and flow rate.............................................................................................................
8.1.4
Changing the pre-pressure of the expansion vessel .............................................................................................
8.1.5
To check the water volume: Examples ..................................................................................................................
8.2
Connecting water piping ........................................................................................................................................................
8.2.1
About connecting the water piping .......................................................................................................................
8.2.2
Precautions when connecting the water piping....................................................................................................
8.2.3
To connect the water piping..................................................................................................................................
8.2.4
To fill the water circuit ...........................................................................................................................................
8.2.5
To protect the water circuit against freezing ........................................................................................................
8.2.6
To fill the domestic hot water tank........................................................................................................................
8.2.7
To insulate the water piping ..................................................................................................................................
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
NOTICE
In case of plastic pipes, make sure they are fully oxygen diffusion tight according to
DIN 4726. The diffusion of oxygen into the piping can lead to excessive corrosion.
Connecting piping - Legislation. Make all piping connections in accordance with
the applicable legislation and the instructions in the "Installation" chapter,
respecting the water inlet and outlet.
Connecting piping - Force. Do NOT use excessive force when connecting the
piping. Deformation of the piping can cause malfunctioning of the unit.
Connecting piping - Tools. Only use appropriate tooling to handle brass, which is
a soft material. If NOT, pipes will get damaged.
Connecting piping - Air, moisture, dust. If air, moisture or dust gets into the
circuit, problems may occur. To prevent this:
-
ONLY use clean pipes.
-
Hold the pipe end downwards when removing burrs.
-
Cover the pipe end when inserting it through a wall, to prevent dust and/or
particles from entering the pipe.
-
Use a decent thread sealant to seal connections.
-
When using non-brass metallic piping, make sure to insulate both materials
from each other to prevent galvanic corrosion.
-
Because brass is a soft material, use appropriate tooling for connecting the
water circuit. Inappropriate tooling will cause damage to the pipes.
Insulation. Insulate up to the base of the heat exchanger.
Freeze. Protect against freezing.
 10].
8
Piping installation
|
"2  General safety
Installer reference guide
83
83
85
86
88
88
89
89
89
89
91
91
95
95
83

Advertisement

Table of Contents
loading

Table of Contents