Table Of Contents - Harvia PO10E Instructions For Installation And Use Manual

Electric sauna heater
Hide thumbs Also See for PO10E:
Table of Contents

Advertisement

These instructions for installation and use are
intended for the owner or the person in charge of
the sauna, as well as for the electrician in charge
of the electrical installation of the heater. After
completing the installation, the person in charge
of the installation should give these instructions to
the owner of the sauna or to the person in charge
of its operation. Please read the instructions for use
carefully before using the heater.
The heater is designed for the heating of a sauna
room to bathing temperature. It is not to be used
for any other purpose.
Congratulations on your choice!
Guarantee:
The guarantee period for heaters and control
equipment used in saunas by families is two (2)
years.
The guarantee period for heaters and control
equipment used in saunas by building residents
is one (1) year.
The guarantee period for heaters and control
equipment used in saunas by institutions is
three (3) months.
The guarantee does not cover any faults
resulting from failure to comply with
installation, use or maintenance instructions.
The guarantee does not cover any faults
resulting from the use of stones not
recommended by the heater manufacturer.
CONTENTS
1. INSTRUCTIONS FOR USE .............................................. 3
1.1. Piling of the Sauna Stones ..................................... 3
1.1.1. Maintenance ............................................... 3
1.2. Heating of the Sauna ............................................ 3
1.3. Control Unit of Heater ........................................... 3
1.4. Throwing Water on Heated Stones ......................... 4
1.5. Instructions for Bathing ........................................ 4
1.6. Warnings ............................................................ 4
1.6.1. Symbols descriptions .................................... 4
1.7. Troubleshooting ................................................... 4
2. SAUNA ROOM ............................................................. 5
2.1. Sauna Room Structure .......................................... 5
2.1.1. Blackening of the Sauna Walls ....................... 6
2.2. Sauna Room Ventilation ........................................ 6
2.3. Heater Output ...................................................... 6
2.4. Sauna Room Hygiene ............................................ 6
3. INSTRUCTIONS FOR INSTALLATION .............................. 7
3.1. Before Installation ................................................ 7
3.3. Electrical Connections ........................................... 7
3.4. Installing the Heater ............................................. 8
4. SPARE PARTS ........................................................... 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Po12ePo15e

Table of Contents