INSTALLATION ACCEPTANCE CHECKLIST
Provided below is an Installation Acceptance Checklist. This checklist helps ensure proper installation and
initial operation of the system. As the procedures presented in this document are completed, check the
appropriate box in this list. If the procedure is not required for your installation site, also check the box in this
list to indicate that the procedure was read. When installation is done, ensure that each block in this list has
been checked.
Relay Rack Mounted to Floor
Relay Rack Grounding Connection Made
Battery Disconnect Circuit Breakers (if furnished) External Alarm Connections Made
Battery Connections to Respective Power System Made
Batteries Installed
System Started
MOUNTING THE RELAY RACK
This equipment is intended only for installation in a Restricted Access Location on or above a non-combustible
surface.
The installer should be familiar with the installation requirements and techniques to be used in mounting the
relay rack to the floor.
Refer to Figure 1 or Figure 2 for floor mounting hole dimensions.