Upgrade kit

Advertisement

Description of the Upgrade
Installation Procedure for the Upgrade
Step 27. Install the Test Set Cables
Follow instructions carefully when making cable connections, especially
wire harness connections. Incorrect connections can destroy components,
resulting in additional customer costs.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables may be necessary but do not over-bend them.
Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections
except the front and rear panel cable connectors. On the bias tees use a
5/16-in torque wrench set to 9 in-lbs. On the bulkhead connectors, use a 9
mm nutsetter or open end torque wrench set to 21 in-lb.
Flexible Cables Required for Upgrading to an Option 419 PNA-X
Install the following flexible cables in the order listed. To see images showing
the location of these cables, click either of the Chapter 6 bookmarks "Bottom
RF Cables, 4-Port, Option 419, S/N Prefix
New parts are listed in
— W62 (N5242-60021)A27 mixer brick (R1) to A24 IF multiplexer (P411)
— W63 (N5242-60022)A27 mixer brick (R2) to A24 IF multiplexer (P412)
Semirigid Cables Required for Upgrading to an Option 419 PNA-X
To see images showing the location of these cables, click the Chapter 6
bookmark "Bottom RF Cables, 4-Port, Option 419, S/N Prefix
PDF Service Guide
— Follow the two instructions shown in
Installation Note N5245-90133
Table 2 on page
12.
1
. New parts are listed in
Figure 18
6021" in the PDF Service Guide
6021" in the
Table 2 on page
12.
in this document.