Download Print this page

Watts Benchmark Aerco OMM-0122 Installation And Start-Up Manual page 97

Natural gas, propane gas and dual fuel fired modulating & condensing boilers

Advertisement

Benchmark 750-3000 Boiler Installation & Startup Manual
SECTION 5 – SAFETY DEVICE TESTING
5.11 IGNITION SWITCH OPEN DURING IGNITION
The Ignition switch (and the Purge switch) is located on the Air/Fuel Valve. To check the
switch, proceed as follows:
Ignition Switch Open During Ignition Check Instructions
1. Set the unit's ON/OFF switch to the OFF position.
2. Place the unit in MANUAL mode and set the valve position between 25% and 30%.
3. Remove the Air/Fuel Valve cover (Figure 5-10a or 5-10b, above) by rotating the cover
counterclockwise to unlock and lift up to remove.
4. Remove one of the two wires (#169 or #170) from the Ignition switch (see Figure 5-11a or
5-11b, above).
5. Initiate a unit start sequence.
6. The unit should begin its start sequence and then shut down and display IGN SWITCH
OPEN DURING IGNITION.
7. Replace the wire on the Ignition switch and press the CLEAR button. The unit should
restart.
5.12 SAFETY PRESSURE RELIEF VALVE TEST
Test the safety Pressure Relief Valve in accordance with ASME Boiler and Pressure Vessel
Code, Section VI.
OMM-0121_D • GF-205 • 5/9/2019
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 97 of 122

Advertisement

loading