SECTION 5 – SAFETY DEVICE TESTING
HIGH Gas Pressure Test Instructions: BMK 750 – 2500
11. Press the CLEAR button on the C-More Controller to clear the fault.
12. The fault message should clear and the FAULT indicator should go off. The unit should
restart (if in MANUAL mode).
13. Upon test completion, close the ball valve and remove the manometer. Replace the 1/4"
NPT plug removed in step 2.
MANUAL SHUT-OFF
VALVE
GAS INLET
HIGH GAS PRESSURE
Figure 5-3a: BMK 750/1000 HIGH Gas Pressure Test Components
MANUAL
SHUT-OFF
VALVE
HIGH GAS BALL VALVE
Figure 5-3b: BMK 1500/2000: HIGH Gas Pressure Fault Test
OMM-0121_D • GF-205 • 5/9/2019
BALL VALVE
TO
AIR/FUEL
VALVE
SSOV
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
TO AIR/FUEL
VALVE
HIGH GAS
PRESSURE SWITCH
LOW GAS
PRESSURE SWITCH
1/4" NTP PLUG
(Install manometer here
for High Gas Pressure
Test)
NATURAL GAS
INLET
HIGH GAS
PRESSURE
SWITCH
LOW GAS
PRESSURE
SWITCH
1/4" NPT PLUG
(Install manometer here
for HIGH gas pressure
fault test)
SSOV
Page 83 of 122